My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-020 - Statement Overriding Considerations for the Property Located at One Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:44 PM
Creation date
7/29/2004 5:12:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-020
Date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />4.2.2.2 Findings Related to Fugitive Dust <br /> <br />Findings and Facts in Support of Findings <br /> <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br /> <br />4.2.2.3 Facts in Support ofthe Finding Related to Fugitive Dust <br /> <br />Implementation of mitigation measure G-3, provided below, will substantially lessen the adverse <br />impacts of the One Broadway Plaza project related to fugitive dust, and will reduce these <br />potentially significant adverse impacts to below a level of significance. <br /> <br />G-3 <br /> <br />Prior to obtaining a grading permit for project construction, the Final Geology and Soils <br />Report will specifically assess grading control with special emphasis on controlling fugitive <br />dust which could be generated during site preparation, grading and construction. The <br />reports will specifically provide for establishing procedures for dust control and monitoring <br />so that unacceptable levels of dust do not escape from the site. These dust control measures <br />will be coordinated with the dust control measures described in Section 3.4 (Air Quality). <br />The standards and procedures developed in the reports will be incorporated into the grading <br />plan to be followed by the project developer. <br /> <br />4.2.3.1 Potentially Significant Adverse Impact Related to Seismicity <br /> <br />As described in detail in Section 3.2 (Topography, Geology and Soils) in the EIR, construction <br />the One Broadway Plaza project will be subject to future seismic activity. <br /> <br />4.2.3.2 Findings Related to Seismicity <br /> <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br /> <br />4.2.3.3 Facts in Support of the Finding Related to Seismicity <br /> <br />Implementation of mitigation measure G-4, provided below, will substantially lessen the adverse <br />impacts of the One Broadway Plaza project related to seismicity, and will reduce these <br />potentially significant adverse impacts to below a level of significance. <br /> <br />G-4 <br /> <br />All structures to be erected on the One Broadway Plaza site will be designed in accordance <br />with the seismic design provisions in the Final Geology and Soils Report and ofthe Unifonn <br />Building Code to promote safety in the event of such an earthquake. <br /> <br />4.2.4.1 Potentially Significant Adverse Impact Related to Groundwater <br /> <br />Resolution No. 2004-020 <br />Page 44 of 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.