<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />One Broadway Plaza <br /> <br />Findings and Facts in Support of Findings Environmental Impact Report <br /> <br />TABLE 1 <br />MITIGA TION MONITORING PROGRAM FOR THE ONE BROADWAY PLAZA PROJECT <br /> <br />:;u <br />CD <br />(JI <br />Q. <br />c:: <br />...... <br />õ' <br />:J <br />-,:¡Z <br />[\) ~ <br />(ON <br />CDO <br />-.... O <br />O~ <br />-0 <br />-"" N <br />(,,)0 <br /> <br /> Mitigation Measure Implementation Responsible <br /> Schedule Department <br /> Land Use Measures <br />There are no significant adverse land use impacts and no mitigation is required. <br /> TOPol!raphy, Geolo1!Y and Soils <br />G-I The design for the project will comply with all provisions of the Preliminary Geotechnical Feasibility During design, grading and Executive Director of the <br /> Investigation performed by Zeiser Kling Consultants and their Addendum Recommendations, including construction. Public Works Agency <br /> recommendations for grading, removal and recompaction of soils, foundations, settlement, pile foundations, (PW A )/Executive Director <br /> design criteria, seismic design, retaining walls, ferrous corrosion, surface drainage, pavement design, concrete of Building & Planning <br /> hardscape, soldier pile/logging svstem and supplemental investigations. (PBA) or his/her designee. <br />G-2 Prior to acquiring a grading permit for project construction, the developer will prepare a Final Geology and Soils Prior to obtaining a grading Executive Director of the <br /> Report, to specifically assess the following: permit. PW AIPBA or hislher <br /> i. The shrink-swell potential of potentially expansive soils on the site; specifically addressing appropriate designee. <br /> recommendations for soil treatments, grading procedures and/or foundation designs, as appropriate, for the <br /> planned land use on the site. <br /> 11. The potential for compressible soils on the site; specifically addressing appropriate recommendations for soil <br /> treatments, grading procedures and/or foundation designs, as appropriate, for the planned land use on the site. <br /> The recommendations from the Final Geology and Soils Report will be incorporated into the grading plan for the <br /> project. <br />G-3 Prior to obtaining a grading permit for project construction, the Final Geology and Soils Report will specifically Prior to obtaining a grading Executive Director of the <br /> assess grading control with special emphasis on controlling fugitive dust which could be generated during site permit. PW AlPBA or hislher <br /> preparation, grading and construction. The reports will specifically provide for establishing procedures for dust designee. <br /> control and monitoring so that unacceptable levels of dust do not escape from the site. These dust control <br /> measures will be coordinated with the dust control measures described in Section 3.4 (Air Quality). The standards <br /> and procedures developed in the reports will be incorporated into the grading plan to be followed by the project <br /> develooer. <br />G-4 All structures to be erected on the One Broadway Plaza site will be designed in accordance with the seismic During design and Executive Director of the <br /> design provisions in the Final Geology and Soils Report and of the Uniform Building Code to promote safety in construction PW AlPBA or hislher <br /> the event of such an earthquake. designee. <br />G-5 During final design, the developer will consult with the Orange County Water District and the Regional Water During final design and Executive Director of the <br /> Quality Control Board, Santa Ana, regarding intrusion of foundation piles into the Orange County Groundwater construction. PW A or hislher designee. <br /> Basin. The project applicant will solicit the appropriate permits and approvals from the OCWD and the RWQCB <br /> for the anticipated intrusion ofthe foundation piles into the Groundwater Basin <br /> and will incorporate measures identified by those agencies in the final design and construction specifications for <br /> the project. <br />