My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SELECT ELECTRIC, INC. (TRAFFIC SIGNAL INSTALLATION AT SEGERSTORM AVENUE AND ROSEWOOD AVENUE)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
SELECT ELECTRIC, INC. (TRAFFIC SIGNAL INSTALLATION AT SEGERSTORM AVENUE AND ROSEWOOD AVENUE)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2026 10:43:41 AM
Creation date
3/10/2025 9:21:34 AM
Metadata
Fields
Template:
Contracts
Company Name
SELECT ELECTRIC, INC.
Contract #
P25-6030
Agency
Public Works
Council Approval Date
1/21/2025
Expiration Date
1/1/1900
Insurance Exp Date
3/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> - ,7 r PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 25-6060 Traffic Signal Installation at Segerstrom Change Order Number 1 <br /> Avenue and Rosewood Avenue <br /> To Select Electric, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. To compensate the contractor for installation of additional sewer liner for the 10-inch vitrified <br /> clay pipe (VCP) per PCO401 dated February 9, 2026. <br /> AGREED PRICE =$10,225.00 <br /> 2. To compensate the contractor for pumping water during the installation of foundations for <br /> pole #5 and 6 per PCO#03.1 dated April 22, 2026. <br /> AGREED PRICE=$14,873.16 <br /> 3. To compensate the contractor for repair of an unmarked storm drain during boring operations <br /> per PCO#04.1 dated April 22, 2026. <br /> AGREED PRICE =$577.08 <br /> 4. To compensate the contractor for installing colored curb ramps and alternating broom finish <br /> for stamped concrete per PCO#06 dated February 26, 2026. <br /> AGREED PRICE,= $11,275.00 <br /> 5. To compensate the contractor for material costs and revised hand rail details per PCO#08 <br /> dated April 16, 2026.. <br /> AGREED PRICE =$15,981.31 <br /> 6. To compensate the contractor for relocating conflicting irrigation system on a Time and <br /> Materials basis (T&M) per PCO#09 dated April 16, 2026. <br /> AGREED PRICE = $758.52 <br /> TOTAL AGREED PRICE.= $53,690.07 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.