Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />construction, the proposed proj ect would be required to comply <br />with SCAQMD Fugitive Dust Rule 403 to suppress dust generated by <br />construction operations. <br /> <br />Mitigation Measures <br /> <br />To ensure compliance with SCAQMD Fugitive Dust Rule 403, grading <br />plans and demolition plans for the proposed project shall <br />reflect the following notes: <br /> <br />1. All material excavated or graded will be sufficiently <br />watered to prevent excessive amounts of dust. <br />Watering with complete coverage shall occur at least <br />twice daily I once in the late morning and once after <br />work is done for the day. <br /> <br />2. All clearing <br />during period <br />averaged over <br />smog episodes. <br /> <br />and earthwork activities shall cease <br />of high winds (winds greater than 25 mph <br />one hour) or during Stage 1 or Stage 2 <br /> <br />3. Streets surrounding the project site should be cleaned <br />at the end of each day of construction. <br /> <br />4. All material transported offsite shall <br />sufficiently watered or securely covered <br />excessive amounts of dust. <br /> <br />either be <br />to prevent <br /> <br />5. The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br /> <br />6. Equipment engines shall be <br />condition and in proper <br />manufacturer's specifications. <br /> <br />maintained in <br />tune according <br /> <br />good <br />to <br /> <br />7. To the extent <br />shall be used <br />activities. <br /> <br />feasible, gasoline powered equipment <br />for onsite and offsite construction <br /> <br />c. <br /> <br />Result in a cumulatively considerable net increase of any <br />criteria pollutant for which the project region is non- <br />attainment under an applicable federal or state ambient air <br />quality standard? <br /> <br />Less Than Significant Impact <br /> <br />6 <br /> <br />31~~29 <br />