Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Mitigation Measure <br /> <br />. <br /> <br />Prior to the demolition of any structures on the project <br />site, an asbestos and lead paint survey shall be prepared <br />to determine the presence of asbestos building materials <br />and lead paint. The asbestos/lead paint survey shall be <br />submitted to the City's Environmental Coordinator for <br />review. <br /> <br />C. <br /> <br />Be located on a site which is located on a list of <br />hazardous material sites compiles pursuant to Government <br />Code Section 659662.5 and, as a result, would it create a <br />significant hazard to the public or the environment? <br /> <br />No Impact <br /> <br />According to the EDR database, state and federal records and the <br />City Santa Ana Fire Department, the project site is not included <br />on a list of hazardous material sites. Implementation of the <br />proposed project would not create a significant hazard to <br />the public or the environment. <br /> <br />D. <br /> <br />For a proj ec t located wi thin an airport land use plan or <br />where such a plan has not been adopted, wi thin two miles <br />where a public airport or public use airport, would the <br />project result in a safety hazard for people residing or <br />working in the project area? <br /> <br />Less Than Significant Impacts <br /> <br />According to the Orange County Airport "Land Use Commission <br />Airports Environs Land Use Plan, the project site is not located <br />wi thin an accident potential zone I clear zone or FAA <br />Notification Area. Implementation of the proposed project would <br />not result in safety hazards to people residing within the <br />project area. <br /> <br />VIII. HYDROLOGY/WATER QUALITY <br /> <br />A. <br /> <br />Violate Regional Water Quality Control Board water quality <br />standards or waste discharge requirements? <br /> <br />Potentially Significant Unless Mitigation Incorporated <br /> <br />The primary sour:ce of potential adverse water quality impacts <br />associated with the operation of the proposed project would be <br /> <br />14 <br /> <br />3~A~37 <br />