Laserfiche WebLink
<br />~~fA <br /> <br />Environmental Checklist <br />For CEQA Compliance <br /> <br />Issues & Supporting Information Sources <br /> <br />B. <br /> <br />Exceed, either individually or cumulatively, a level <br />of service standard established by the county <br />congestion management agency for designated <br />roads or highways? <br /> <br />C. <br /> <br />Result in a change in air traffic patterns, including <br />either an increase in traffic levels or a change in <br />location that results in substantial safety risks? <br /> <br />D. <br /> <br />Substantially increase hazards to a design feature <br />(e.g. sharp curves or dangerous intersections) or <br />incompatible uses (e.g. farm equipment)? <br /> <br />E. <br /> <br />Result in inadequate emergency access? <br /> <br />F. <br /> <br />Result in inadequate parking capacity? <br /> <br />G. <br /> <br />Conflict with adopted policies supporting alternative <br />transportation (e.g. bus turnouts, bicycle racks)? <br /> <br />XVI. Utilities and Service Systems <br /> <br />A. <br /> <br />Exceed wastewater treatment requirements of the <br />applicable Regional Water Quality Control Board? <br /> <br />B. <br /> <br />Require or result in the construction of new water <br />or wastewater treatment facilities or expansion of <br />existing facilities, the construction of which could <br />cause significant environmental effects? <br /> <br />C. <br /> <br />Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />D. <br /> <br />Are sufficient water supplies available to serve the <br />project from existing entitlements and resources or <br />are new or expanded entitlements needed? <br /> <br />E. <br /> <br />Result in the determination by the wastewater' <br />treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the <br />project's projected demand in addition to the <br />provider's existing commitments? <br /> <br />rndlrnswordlenvcheck.doc\1.1 ;:¡.9~ <br /> <br />P31Ä~<66 <br /> <br />Potentially <br />Significant <br />Impact <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br />0 <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />Potentially <br />Significant <br />Unless <br />Mitigation <br />Incorporated <br /> <br />~ <br /> <br />0 <br /> <br />0 <br /> <br />0 <br />0 <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />D <br /> <br />Less Than <br />Significant <br />Impact <br /> <br />0 <br /> <br />~ <br /> <br />A <br /> <br />È( <br />J:( <br />~ <br /> <br />~ <br />~ <br /> <br />D <br /> <br />X <br />M <br /> <br />No <br />Impact <br /> <br />0 <br /> <br />0 <br /> <br />0 <br /> <br />0 <br />0 <br />0 <br /> <br />0 <br /> <br />D <br /> <br />0 <br /> <br />0 <br /> <br />D <br /> <br />Page 9 ot 10 <br />