Laserfiche WebLink
<br />JULY 26, 2004 <br />PAGE 3 OF 3 <br /> <br />16. <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />Grading plans and building plans for the proposed project shall <br />reflect that the lowest finish floor elevation of any structure <br />shall be one foot above the highest adjacent grade for the AO-l <br />zone and at least as high as the depth number specified for the <br />AE Zone on the flood insurance rate map. All elevations must be <br />referenced to the National Geodetic Vertical Datum. Reference <br />should be made to the Flood Plain Management Ordinance for <br />complete requirements, Santa Ana Municipal Code, Chapter 7. <br /> <br />Grading plans and building plans for the proposed project shall <br />note that construction activities on the project site shall not <br />take place between the hours of 8: 00 p. m. and 7: 00 a. m. on <br />weekdays, including Saturday, or any time on Sunday or a federal <br />holiday. <br /> <br />No construction equipment on the proj ect <br />including warming up until after 7:00 a.m. <br /> <br />site <br /> <br />shall <br /> <br />operate <br /> <br />All construction equipment shall <br />tuned to minimize noise emissions. <br /> <br />be <br /> <br />properly <br /> <br />maintained <br /> <br />and <br /> <br />All equipment shall be fitted with properly operating mufflers <br />and air intake silencers no less efficient than those originally <br />installed. <br /> <br />Stockpiling and vehicle staging areas shall be located away from <br />existing residential uses. <br /> <br />The name and telephone <br />posted on-site. <br /> <br />number of <br /> <br />shall <br /> <br />be <br /> <br />contact <br /> <br />a <br /> <br />person <br /> <br />Construction shall be subj ect to any and all provisions <br />forth by the City of Santa Ana Planning Department. <br /> <br />set <br /> <br />Prior to the issuance of building permits, the project developer <br />shall submit evidence to the City of Santa Ana of a fee payment <br />between the developer and the Garden Grove School District to <br />offset school facility impacts. <br /> <br />758-30 <br />