My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - AMEND APL 2004-004 Map 16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
08/16/2004
>
75B - AMEND APL 2004-004 Map 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:22 PM
Creation date
8/11/2004 4:08:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
8/16/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />According to the Santa Ana Fire Department, the goal of the fire <br />department is ~o have an onsite response time of 5: 00 or less <br />80% of the time. Fire Station No.8 located at 501 North Newhope <br />would be the closest fire station to the project site. <br />Presently, a shift at Fire Station NO.8 consists of six fire <br />fighters, 1 fire truck, and 1 emergency response unit. <br /> <br />The proposed proj ect would result in an increased demand for <br />fire protection and emergency services within the project area. <br />The Santa Ana Fire Department has indicated that under existing <br />levels of manpower and equipment, it does not anticipate any <br />sigrcificant constraints in providing adequate fire protection <br />services to the proposed project. The existing fire stations in <br />theproj~~t area would be able to adequately respond to project- <br />related demand for fire ~ and emergency serVlces. 1-O.I1J1 Llul1dl1y, <br />t.hrough the City's development review process, the Santa Ana <br />Fire Department has determined that the proposed pro] ect would <br />be in compliance with the City's Fire Code. <br /> <br />Police Protection: <br /> <br />Less Than Significant Impact <br /> <br />The Santa Ana Police Department would provide police protection <br />services for the proposed project. The Police Department is <br />headquartered at 60 Civic Center Plaza. The City of Santa Ana is <br />subdivided into four policing districts, with each district <br />serving a section of the City. The proposed proj ect is located <br />wiLhin the Westend District. <br /> <br />Implementation of the proposed project would increase the demand <br />for police protection services. The Santa Ana Police Department <br />has indicated that under existing levels of manpower and <br />equipment, they would have the ability to provide adequate <br />police protection services. <br /> <br />School Facilities: <br /> <br />Potentially <br />Incorporated <br /> <br />Significant <br /> <br />Unless <br /> <br />Mitigation <br /> <br />The proj ect site is wi thin the boundaries of the Garden Grove <br />School District. The proposed project would increase the number <br />of students at nearby schools and would contribute to increase <br />demand for school services. The project would be subject to <br />school impact fees to fund the enhancement of existing school <br />facilities or for the construction of new schoel facilities. The <br />payment of school impact fees to the Garden Grove School <br />District would mitigate project-related impacts to school <br />services to a level considered less than significant. <br /> <br />23 <br /> <br />75~5° <br />
The URL can be used to link to this page
Your browser does not support the video tag.