My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - AMEND APL 2004-004 Map 16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
08/16/2004
>
75B - AMEND APL 2004-004 Map 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:22 PM
Creation date
8/11/2004 4:08:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
8/16/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The City of Santa Ana Warer Department would provide domestic <br />water service for the proposed proj ect. The City of Santa Ana <br />produces water from two sources. The Orange County Groundwater <br />Basin provides 66% of the annual water supply and the <br />Metropolitan Water District provides 34% of the annual water <br />supply. The City of Santa Ana has 19 active wells with combined <br />capacities of approximately 42,500 gallons per minute. The City <br />also has seven MWD connections with combined normal operating <br />capacities of 20,700 gallons per minute. The total combined <br />capacity of all water production facilities is 63,200 gallons <br />per minute. According to the City's 2000 Urban Water Management <br />Plan, the projected water demand for the City in 2004 would be <br />approximately 51,000 acre feet per year. The proposed project is <br />consistent with the General Plan and the water demands for the <br />pro'ect are accounted for in the City's Urban Water Management. <br />To adequately serVlce tne propose <br />distribution facilities would be needed. With the construction <br />of new water distribution facilities, impacts on water service <br />would be less than significant. <br /> <br />A. <br /> <br />Exceed wastewater treatment requirements <br />applicable Regional Water Quality Control Board? <br /> <br />of <br /> <br />the <br /> <br />E. <br /> <br />Result in the determination by the wastewater treatment <br />provider, which serves or may serve the project that it <br />has adequate capacity to serve the project's projected <br />demand in addition to the providers existing commitments. <br /> <br />Less Than Significant Impact <br /> <br />The project area is improved with exiting wastewater <br />distribution facilities. Wastewater service for the proposed <br />proj ect would be provided by, the City of Santa Ana and the <br />Orange County Sanitation District (OCSD). Wastewater from the <br />proj ect would be treated at the OCSD treatment plant No.1 in <br />the City of Fountain Valley. The wastewater demands for the <br />proj ect are accounted for in the City's Urban Water Management <br />Plan. The wastewater flows gene:r-ated from the proposed proj ect <br />would provide an incidental increase in the amount of wastewater <br />flows to the Fountain Valley treatment plant and would not have <br />a significant impact on wastewater treatment facilities. <br />However, to adequately serVlce the proposed proj ect new <br />wastewater dist:r-iburion facilities would be needed. With the <br />construction of new wastewater distribution facilities, impacts <br />on wastewater service would be less than significant. <br /> <br />27 <br /> <br />Page 27 SB-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.