Laserfiche WebLink
<br />referenced to the <br />National Geodetic <br />Vertical Datum. <br />Reference should be made <br />to the Flood Plain <br />Management Ordinance for <br />complete requirements, <br />Santa Ana Municipal <br />Code, Chapter 7. <br /> <br />Grading Plans and <br />Building Plans for the <br />proposed project shall <br />note that construction <br />activities on the <br />project site shall not <br />take place between the <br />hours of 8:00 p.m. and <br />7:00 a.m. on weekdays, <br />including Saturday, or <br />any time on Sunday or a <br />federal holiday. <br /> <br />No construction <br />equipment on the project <br />site shall operate <br />including warming up <br />until after 7:00 a.m. <br /> <br />All construction <br />equipment shall be <br />properly maintained and <br />tuned to minimize noise <br />emissions. <br /> <br />All equipment shall be <br />fitted with properly <br />operating mufflers and <br />air intake silencers. <br /> <br />Stockpiling and vehicle <br />staging areas shall be <br />located away from <br />existing residential <br />uses. <br /> <br />Prior to <br />Grading <br />Permits <br /> <br />During <br />Grading <br /> <br />7 5ßa~7gr50 <br />