Civic Center Rehabilitation from Shelton Street to Flower Street <br />March 18, 2025 <br />Page 3 <br />specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to Hardy & Harper, Inc. (Exhibit 3). <br />Hardy & Harper, Inc. has previously performed work as a prime contractor in the City of <br />Santa Ana within the last five years, most recently completing the Alton Avenue <br />Rehabilitation Project. The contractor satisfactorily completed these projects and staff <br />recommends awarding the construction contract to Hardy & Harper, Inc. for the <br />construction of the project. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes a budget allocation for construction administration, <br />inspection, and testing. Construction administration and inspection may be performed <br />by either Staff or consultants and includes construction management, inspection of the <br />Contractor's work to ensure contract compliance, workmanship and quality, materials <br />testing, and implementation of the labor requirements. <br />Any of the allocated construction administration funds not spent are considered project <br />savings and are returned to the respective fund balance upon close out of the project. <br />As indicated in the Cost Analysis and as summarized in the table below, the estimated <br />total construction delivery cost of the project is $1,144,000. <br />Project Item <br />Total <br />Construction Contract <br />$915,000 <br />Contract Administration <br />73,067 <br />Inspection <br />45,667 <br />Testing <br />18,266 <br />Contingencies <br />92,000 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$1,144,000 <br />Project Schedule and Contract Time <br />The completion date is May 2026, barring unforeseeable conditions such as rain, <br />natural disasters, or other delays beyond the control of the City and of the Contractor. <br />The contract time for this project is 45 working days, as specified in the bid documents. <br />Working days are counted in accordance with the City's Standard Specifications, which <br />exclude weekends, City -observed holidays, and inclement weather days that prevent <br />work. The projected project schedule is provided below. <br />