My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - BAIL BOND FIRMS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
09/07/2004
>
75C - BAIL BOND FIRMS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:00:58 PM
Creation date
9/2/2004 12:39:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
9/7/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />H. <br /> <br />Place housing within a lOO-year floodplain, as mapped on a <br />federal Flood Hazard Boundary or Flood J:nsurance Rate Map <br />or other flood hazard delineation map? <br /> <br />No J:mpac t <br /> <br />The City's General plan identifies that portions of Santa Ana <br />are within the lOO-year flood Zone. Approval of the proposed <br />amendment to the Municipal Code to establish an ordinance for <br />the regulation of bail bond uses would not facilitate <br />development within areas subject to lOO-year flood risks. <br /> <br />J. <br /> <br />Result in significant alteration of receiving water quality <br />during or following construction. <br /> <br />K. <br /> <br />Could the proposed project result in increased erosion <br />downstream? <br /> <br />No J:mpact <br /> <br />Erosion refers to the removal of soil from exposed bedrock <br />surfaces by water or wind. The effects of erosion are <br />intensified with an increase in slope, the narrowing of runoff <br />channels and by the removal of groundcover, which leaves the <br />soil exposed. Approval of the proposed ordinance would not <br />result in erosion impacts, in that the proposed amendments would <br />not involve any construction activities that would disturb or <br />uncover soils to facilitate erosion impacts. Through the <br />conditional use permit process, future bail bond uses <br />implemented under the proposed ordinance would be evaluated for <br />potential soil erosion impacts and would be subject to the <br />City's erosion control requirements.. .. <br /> <br />o. <br /> <br />P. <br /> <br />s. <br /> <br />Tributary to other environmentally sensitive areas? J:f so, <br />can it exacerbate already existing sensitive conditions? <br /> <br />Have a potentially significant environmental impact or <br />surface water quality to either marine, fresh or wetland <br />waters? <br /> <br />Impact aquatic, wetland or riparian habitat? <br /> <br />No Impact <br /> <br />According to the City's General Plan Land Use Element EIR, there <br />are no sensitive marine waters, fresh waters or wetlands in the <br />City. However, the City does contain several drainage systems <br /> <br />15C~32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.