My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2657
Clerk
>
Ordinances
>
2000 - 2010 (NS-2416-2812)
>
2004 (NS-2641 - NS-2673)
>
NS-2657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:01:28 PM
Creation date
9/7/2004 2:42:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2657
Date
8/2/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.8.. Work of Public Art. In consideration for the benefits set forth in this <br />Agreement, OWner shalllndude within the Project a work of PubUc Art (the <br />.Public Arf'). The Public Art shall be designed, Installed. and located in <br />compliance with Exhibit C, subject also to the fol.lowing conditions: <br />8. Final Design. Before the earlier of (1) issuance of the first building permit <br />for the ProJect and (2) the sixth anniversary of the Effective Date, OWner <br />shall submit to the City the final design of the Public Art. <br />b. Installation" Before the earlier of (1) the City's issuance of a Certificate of <br />Use for the mafnCathedral building and (2) thelwelfth anniversary of the <br />Effective Date, Owner shall install the Public Art. The latter date shall be <br />extended to Nn concurrent with any extension of the Tefl1't. <br /> <br />'- <br /> <br />c. Failure to Meet Time Requlre.ments. If OWner falls to meet either of the <br />time requirements set forth in Sections 5.8 a and b above. Owner shall pay <br />the City $250,000 to be used by the City to acquire other public art for <br />other locations within the City. <br />In either Instance. Owner will not be considered In default under this <br />Agreement. <br /> <br />d. Progress Reports. During the construction and/or installation of the <br />Public Art, OWner shall provide City with written reports on the progress of <br />the construction when and as reasonably requested by the City. The <br />report shall be in such form and detail as may be reasonably required by <br />the City. The tlmeframes set forth above for final design and installation of <br />the Public Art may be modified at any time or times by mutual written <br />agreement of the Parties. Such revisions do not constitute amendments of <br />this Agreement requiring further notiçe and public hearing. Either the <br />Planning Director or the City Manager is authorized to sign such <br />agreements on behalf of the City. <br />8. Responsibility For Costs of Work Of Public Art. Owner shaH be <br />responsible for all costs associated with the design, construction. <br />maintenance. and repair of the Public Art. <br /> <br />....., <br /> <br />f. City to Receive Contract Documents. OWnershaU furnish City, upon <br />written request, copies of contracts and supporting documents relating to <br />the Public Art. <br /> <br />5.9. Moratoria. The Project shall be exempt from any moratorium adopted after <br />the Effective Date which would oth8fWise affect the construction, use, or <br />density of the Property. <br /> <br />5.10. Conditionsot Discretionary Approvals. Except as provided in Section 4.3 <br />above, the conditions of the Existing Approvals and any discretionary approval <br /> <br />-- <br /> <br />",-," <br /> <br />Ordinance No. NS-2657 <br />Page 10 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.