Laserfiche WebLink
CONSENT CALENDAR - Continued <br /> <br />SPEC. 734-230 - Hot Pour Rubberized Mastic <br />Seal; annual requirement; opening date, <br />June 11, 1973, 2:00 P.M. (CA 89 F) <br /> <br />SPEC. 734-232 - Liquid Asphalt Sealer; annual <br />requirement; opening date, June 11, 1973, <br />2:00 P.M. (CA 89 F) <br /> <br />SPEC. 734-233 - Emulsion - Aggregate Slurry; <br />annual requirement; opening date, June 11, <br />1973, 2:00 P.M. (CA 89 F) <br /> <br />SPEC. 734-234 - Portland Cement Concrete; <br />annual requirement; opening date, June 11, <br />2:00 P.M. (CA 89 F) <br /> <br />PROJECT 4022A - Construct P-3 Storm Drain <br />Along SPRR From Main Street to Cypress <br />Avenue; opening date, June 19, 1973, <br />2:00 P.M. (CA 89 G) <br /> <br />PROJECT 5014 Installation of New Traffic <br />Signal and Lighting System at Santa Ana <br />Boulevard and Patton Street; opening date, <br />June 11, 1973, 2:00 P.M. (CA 89 B) <br /> <br />BID AWARDS <br /> <br />most responsible bidder: <br /> <br />Awarded contracts as <br />follows on the basis <br />of lowest, best and <br /> <br />TOPICS PROJECT T-3041 (150) Installation of <br />illuminated Street Name Signs at 30 Intersec- <br />tions. Awarded contract to Steiny and Company, <br />Anaheim. (CA 89 B) <br /> <br />PROJECT 3026 - Construct Sanitary Sewer in Shelton <br />Street from McFadden Avenue to Bishop Street. <br />Awarded contract to Ro-Tek Pipe Contracting, <br />Orange. (CA 89 E) <br /> <br />PROJECT 6075 - Reconstruction of East Bowling <br />Green at Santiago Park. Awarded contract to De- <br />Mar Landscape, Anaheim. (CA 89 G) <br /> <br />SPEC. 73-006 - Two door Sports Coupe, Chevrolet, <br />Camaro or equal. Awarded contract to Tommy Ayres <br />Chevrolet, Laguna Beach. (CA 89 A) <br /> <br />SPEC. 73-008 - Two door Sports Coupe, American <br />Motors, Javelin or equal. Awarded contract to <br />Anaheim American on the alternate proposal #2. <br />(CA 89 A) <br /> <br />SPEC. 73-010 - 109" Wheelbase, half ton Utility <br />Van. Awarded contract to Santa Ana Dodge, Inc. <br />(CA 89 A) <br /> <br />Approved Appropriation Adjustment No. 89, and awarded <br />contract as follows on the basis of the lowest, best <br />and most responsible bidder: <br /> <br />CITY COUNCIL MINUTES 163 MAY 21, 1973 <br /> <br /> <br />