Laserfiche WebLink
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />Conditions for Approval for Conditional Use Permit No. 2003-17 <br /> <br />Conditional Use Permit No. 2003-17 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Commission, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. <br /> <br />The applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this conditional use permit. <br /> <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br /> <br />A. <br /> <br />PlanninQ Division <br /> <br />1. <br /> <br />The project shall remain in compliance with Site Plan Review DP No. 04- <br />08. J <br /> <br />2. <br /> <br />Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At this time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />amended. <br /> <br />3. <br /> <br />A combination of berms and hedges need to be provided in the front yard <br />setback area along the Bristol Street frontage to screen the drive-through <br />aisle and reduce glare. <br /> <br />MITIGATION MEASURES <br /> <br />4. <br /> <br />Prior to the issuance of a grading permit, the applicant shall submit for <br />review and approval a surface drainage/grading/erosion control plan <br />prepared by a registered Civil Engineer showing the direction and means <br />of flow to the adjacent street. The plan is to include existing and proposed <br />elevations at and adjacent to all property lines. Drainage routed to the <br />street must be directed beneath the sidewalk and through the curb. <br /> <br />5. <br /> <br />Prior to issuance of a grading permit, the applicant shall prepare an <br />NPDES post-construction storm water management plan per Orange <br />County Drainage Area Management Plan (DAMP) that includes all <br />structural and non-structural Best Management Practices. <br /> <br />Exhibit "A" <br />Page 1 of 2 <br /> <br />Resolution No. 2004-081 <br />Page 7 of 10 <br />