Laserfiche WebLink
ATTACHMENT A <br />CONSULTING RATE SCHEDULE <br />Rates are established based on the level of expertise necessary for specific tasks or project <br />functions. All pricing is current as of the issuance of this document. <br />TASK /PROJECT FUNCTION <br />HOURLY <br />LABOR <br />RATE <br />Phase 1 Environmental Site Assessments (ESA) <br />$ 50.00 <br />Asbestos /Lead Survey & Sam <br />$ 45.00 <br />Asbestos /Lead Abatement Monirming (no on -site <br />analysis) <br />$48.00 <br />Abatement Specifications & Design <br />$ 60.00 <br />Project Management & Chent Representation <br />$ 60.00 <br />Indoor Air Quality Survey & Sampling <br />$ 65.00 <br />Training <br />$ 65.00 <br />Construction and /or Abatement Cost Estimating <br />$ 60.00 <br />Construction and /or Abatement Project Scheduling <br />$ 60.00 <br />Industrial Hygiene Services <br />$ 65.00 <br />Expert Testimony & Litigation Su ort <br />$ 85.00 <br />LABORATORY SERVICES <br />AVP Consulting <br />July 12, 2GID4 Ago 1 oft <br />3To5 <br />24 to 48 <br />8Hr. <br />Day <br />Hr. Turn- <br />Turn - <br />ANALYSIS /METHOD <br />Turn- <br />around <br />around <br />around <br />Asbestos - Bulk Sample / Polarized Light Microscopy <br />$ 10.00 <br />$ 14.00 <br />$ 20.00 <br />P <br />Asbestos - Bulk Sample / Transmission Electron <br />$ 60.00 <br />$ 110.00 <br />$160.00 <br />Microscopy <br />Asbestos - Air Sample / Phase Contrast Microsco C <br />$ 10.00 <br />$ 15.00 <br />$ 17.00 <br />Asbestos - Air Sample / TEM AHERA <br />$ 55.00 <br />$105.00 <br />$ 120.00 <br />Asbestos - Air Sample / TEM Yamate Level II <br />$ 55.00 <br />$110.00 <br />$130.00 <br />Lead - Bulk Sample / Atomic Absorption FAA <br />$ 11.00 <br />$ 19.00 <br />$ 34.00 <br />Lead - Air Sample / Atomic Absorption FAA <br />$12.00 <br />$ 19.00 <br />$ 36.00 <br />Lead - Wipe Sample <br />$ 11.00 <br />$ 19.00 <br />$ 34.00 <br />AVP Consulting <br />July 12, 2GID4 Ago 1 oft <br />