Laserfiche WebLink
<br />and maintained to prevent water inflow or infiltration. The manholes shall <br />also have readily removable covers to facilitate inspection, grease <br />removal, and wastewater sampling activities. <br /> <br />Sec. 39-56.8 Grease Interceptor Maintenance Requirements <br /> <br />Grease Interceptors shall be maintained in efficient operating condition by <br />periodic removal of the full content of the interceptor. The maintenance <br />frequency for all FSEs with a Grease Interceptor is specified in the Rules and <br />Regulations. <br /> <br />No FOG that has accumulated in a grease interceptor shall be allowed to pass <br />into any sewer lateral, sewer system, storm drain, or public right of way during <br />maintenance activities. <br /> <br />FSEs with grease interceptors are required to maintain data and information <br />necessary to establish the maintenance grease interceptors. Said <br />documentation shall be provided to the Program Manager as requested. <br /> <br />Sec. 39-56.9 Multiple FSEs Located on The Same Property <br /> <br />Property owners with more than one FSE located on said property shall be <br />responsible for the installation and maintenance of a grease interceptor(s). <br /> <br />Sec. 39-56.10 Monitoring for Compliance <br /> <br />In an effort to minimize the discharge of FOG to the sewer system the FOG <br />Control Program Manager may require the FSE to monitor and/or sample <br />wastewater for compliance with the Rules and Regulations. <br /> <br />Sec. 39-56.11 Record Keeping Requirements <br /> <br />All FSEs shall be required to keep records in accordance with the Rules and <br />Regulations established by the City under its FOG Control Program for no less <br />than two years. Required records include grease interceptor/trap maintenance <br />and cleaning logs, employee-training logs, waste hauling manifest, interceptor <br />sampling data, and facility plumbing and mechanical plans. The FSE shall, upon <br />reasonable request, make the records available to the Program Manager or his <br />designee. <br /> <br />Sec. 39-56.12 Inspection and Sampling Conditions <br /> <br />A. The FOG Control Program Manager or his designee may inspect or order <br />the inspection and sample the wastewater discharges of any FSE to <br />ascertain whether the FSE is complying with all requirements of this <br />section. The FSE shall allow the City access to the FSE premises, during <br />normal business hours for purposes of inspecting the FSEs grease control <br />devices or interceptor, reviewing the manifests, receipts and invoices <br /> <br />-11- <br />11 A-11 <br />