Laserfiche WebLink
<br />CDC-Santa Ana - Co. Oualifications <br />The Bainbridoe Group, Inc, <br /> <br />05/17/04 <br />Paoe 2 <br /> <br />Phase 2 - Abatement Specifications <br /> <br />The Bainbrídge Group proposes that project specification documents be <br />written in accordance with strict-level health and safety procedures and <br />in accordance with asbestos regulations. The nature of the abatement <br />requires that certain engineering controls be specified in the project <br />documents so that asbestos fiber/concentration levels are minimized to <br />prevent re-entrainment of the materials into the ventilation system and <br />other surfaces. The specifications/work plan will be designed in <br />accordance with federal, state and local regulatory requirements in the <br />ASTM and CSI contract format. <br /> <br />At the conclusion of this phase, a Project Manager will assist the CDC in <br />the coordination and attendance of the contractor's pre-bid conference <br />and will also assist in the review of the contractors' bid documents prior <br />to contract award. <br /> <br />Phase 3 - Asbestos Abatement Monitoring <br /> <br />Prior to the start of the abatement, The Bainbridge Group will assign a <br />senior level Project Manager to attend a pre-con meeting with all parties <br />involved so that all issues and field coordination are discussed and <br />resolved prior to the abatement work. <br /> <br />The Project Manager will then review the awarded abatement <br />contractor's submittal package to assure that all required contractor's <br />documents are satisfied and in compliance with the requirements in the <br />project specifications and the work plan. Once the contractor's <br />submittals are approved, a notice to proceed to abate is given to the <br />abatement contractor. <br /> <br />At this time, The Bainbridge Group assigns one (1) full time personnel <br />as required to monitor the contractor's abatement performance in respect <br />to the safety and compliance to pertinent asbestos regulations and work <br />practices. Monitoring services will be conducted for the duration of the <br />projected abatement work. Periodic air sampling will be conducted <br />before (background), during and after (clearance) to ensure and record <br />the contractor's performance and general personnel protection inside and <br />outside the abatement work areas. <br /> <br />The monitor will also maintain daily observation logs as well as other <br />documents generated during the abatement project. These documents <br />will then be compiled into a book form and will ultimately be forwarded to <br />the CDC at the conclusion of the project along with the waste manifests. <br /> <br />COMPANY QUALIFICATIONS: <br /> <br />The Bainbridge Group, Inc. is a medium size, minority owned and <br />managed business (MBE/DBE) with a diversified staff of experienced <br />management and technical professionals with collective backgrounds in <br />asbestos and hazardous material industrial hygiene. <br /> <br />Specifically, these personnel have extensive and pertinent experience <br />in asbestos, and hazardous material related inspections, design of <br />abatement specifications, working drawings, abatement oversight <br />(monitoring), project support and management. <br />