Laserfiche WebLink
14. The parking area in the back will require power for the future electric gate. <br />15. FS # 8 is slightly different than FS # 3. <br />a. SCE meter # is 708-31879, M -90A. <br />b. The dayroom will require new energy efficient ballasts and lamps in the existing light <br />fixtures and power outlets. <br />C. Absolutely no work in the kitchen. <br />16. The construction administration services include the following. <br />a. Bid walk meeting <br />b. Responses to contractors' RFI's <br />C. Final walk meeting <br />d. Final punch list <br />The Captain will perform duties of the construction manager, and may request additional <br />engineering services on a time and material basis. <br />2— <br />