Laserfiche WebLink
REQUEST FOR PROPOSAL <br />TELEVISION INSPECTION OF SANITARY SEWERS <br />The City of Santa Ana is soliciting proposals from qualified firms for the cleaning, television <br />inspection and video recording, by means of a closed circuit color television camera, of <br />approximately 300,000 linear feet of sanitary sewer mains. <br />This work shall include cleaning of sewer mains prior to videotaping. <br />PROPOSED SCOPE OF SERVICES — TELEVISION INSPECTION OF SANITARY SEWERS <br />The purpose of this proposal is to obtain a qualified firm to provide sewer video recording <br />services. This project continues the video inventory of the city's sewer infrastructure. The <br />majority of the work will consist of videoing individual sewer mains on an as needed basis. <br />However, some of the work will also include the videoing and cleaning of blocks of sewer mains <br />(approximately 3,000 to 10,000 linear feet. <br />The sizes of the lines to be videotaped vary from 4" up to 24" in diameter. The majority of the <br />work will be performed on mains in the 6" through 12" range with more than 50% of the total <br />work being 6". <br />A. SEWER CLEANING <br />All sewers shall be cleaned within 24 hours prior to videoing except as directed <br />otherwise by the Engineer. Cleaning shall include removal of grease, roots, debris and <br />other obstructions to facilitate the T.V. inspection. <br />Consultant shall use the appropriate nozzle or cutter head, (e.g. high velocity, water <br />jet, root cutter, etc.), to accomplish the cleaning as required for that particular reach of <br />sewer. <br />Cleaning methods shall be employed to sufficiently clean the pipe so the camera can pass <br />and can fully ascertain and document the structural and operational condition of the pipe. <br />Any costs associated with video work that is necessitated by the consultant's failure to <br />sufficiently clean the main shall be borne entirely by the consultant. <br />The consultant shall use a maintenance report form supplied by the City to record the <br />location of the cleaning operation, the number of feet cleaned and the conditions <br />encountered for each section of sewer main that is cleaned. The maintenance reports shall <br />be delivered along with the video, logs and other materials when a designated area of work <br />has been completed. The City reserves the right to use both the comprehensiveness and <br />completeness of the cleaning reports along with the cleanliness of the pipe as evidenced by <br />the supplied video to ascertain whether to pipe was cleaned sufficiently. Any costs required <br />8 <br />