COMPENSATION <br />The 300,000 L.F. quantity is an estimate only and is shown solely for the purpose of comparing <br />proposals. The City reserves the right to increase or decrease the amount of any quantity shown <br />without any adjustment in the unit price. <br />Consultant shall be paid the unit price shown in the bid for the amount of work actually <br />completed. In special circumstances, the consultant may be called on to provide emergency <br />video service for a specific problem area or may encounter work that is atypical in nature and <br />requires extra time to complete. In such cases the consultant may elect to invoke an hourly rate <br />for services in lieu of the unit price. The City reserves the right to approve the consultant's <br />request for an hourly rate of compensation and shall base its approval on the following criteria: <br />1. The hourly rate is designed to allow the consultant fair compensation for work <br />performed that is of an emergency or of an unusual or unexpected nature. Such work <br />would reasonably be expected to consume significantly more time than it would take to <br />complete video in most areas of the City. <br />2. The hourly rate shall be calculated by taking the unit rate for video and multiplying <br />that rate by a factor of 400. <br />3. The hourly rate may be invoked without the prior approval of the City when the <br />number of feet specified in a single request for video does not exceed 1600. In such <br />cases the consultant may invoke the hourly rate and charge a four-hour minimum. <br />Hourly rate requests for footage exceeding 1600 or for work requiring more than four <br />hours to complete will be evaluated by the City on a case -by -case basis. <br />4. Requests for hourly rate compensation based on unexpected conditions must be <br />accompanied by videotape or other evidence showing the nature of the delay or difficulty. <br />Hourly rate compensation will not be granted for routine blockages and obstructions that <br />often interrupt the progress of work during a typical day of videotaping sewer mains. <br />These occurrences are to be included in the unit price for video. <br />5. Hourly rates and unit rates for video may be applied on the same calendar day only <br />if the total number of billable feet, as designated by a combination of any footage billed <br />for video at the unit rate added to the number of hours billed multiplied by 400 does not <br />exceed 3200. <br />6. Cleaning will be billed on a per unit basis whether or not video services are <br />compensated with hourly rates. However, the City reserves the right to compensate the <br />contractor at an hourly rate for cleaning by using the unit rate for cleaning and <br />multiplying it by 800. Any contractor requests for hourly -rate compensation must be <br />accompanied by either direct supervision of the cleaning operation by the City or by <br />videotape showing the nature of the extenuating circumstances that necessitated it. <br />Under no circumstances will the contractor be allowed to invoke an hourly rate for <br />cleaning without prior written approval by the City. Hourly rates and unit rates for <br />cleaning may only be applied on the same calendar day only if the total number of <br />billable feet, as designated by a combination of any footage billed for cleaning at the unit <br />rate added to the number of hours billed multiplied by 800 does not exceed 6400. <br />14 <br />