Laserfiche WebLink
2004 PROFESSIONAL FEE SCHEDULE* <br />Leighton Consulting. Inc. FOR PREVAILING WAGE PROJECTS <br />L.I=",o. G1, =o SPECIAL FOR CITY OF SANTA ANA PUBILC WORKS AGENCY <br />PROFESSIONAL SERVICES <br />TECHNICAL STAFF <br />Standard <br />City of Santa Ana <br />.-75 ...................... <br />65 <br />Laborer............................................................. ...................... .......... .............. <br />.................... <br />92 ...................... <br />85 <br />Soil/Field Technician........................................................................................................... <br />95 <br />Staff Engineer/Geologist/Scientist/Field Supervisor..........................................................485 <br />.. <br />"""""""" <br />95 <br />Operations Manager/Equipment Operator........................................................................419...................... <br />Senior Staff Engineer/GeologistIScientist.......................................................................-4-15.....................110 <br />120 <br />Project Engineer/Geologist/Scientist.................................................................................430.................... <br />130 <br />Senior Project Engineer/Geologist/Scientist.....................................................................440.................... <br />.................... <br />150 <br />Associate...........................................................................................................................469 <br />.................... <br />150 <br />Principal.............................................................................................................................0@ <br />289.................... <br />150 <br />SeniorPrincipal................................................................................................................. <br />TECHNICAL SUPPORT STAFF <br />Technical Asst/Word Processor/Project Coordinator..........................................................65...................... <br />60 <br />75 <br />CAD Operator/Technical Illustrator/GIS Specialist..............................................................90 <br />...................... <br />ENGINEERING EQUIPMENT <br />7 per hour <br />VehicleUsage.................................................................................................................................$ <br />1 per day <br />Tiltmeter, Inclinometer Units............................................................................................................ <br />per hour <br />Nuclear Soil Gauge............................................................................................................................5 <br />100 per day <br />GPSStation..................................................................................................................................... <br />Requested <br />OtherEquipment..........................................................................................................................As <br />OTHER TERMS AND CONDITIONS <br />Overtime for field personnel (all technician and staff levels) will be charged at 1.5 times the basic rate. <br />Expert witness testimony will be charged at 2.0 times the above rates, with a minimum charge of four hours per day. <br />Invoices are rendered monthly, payable upon receipt. <br />Proposals are valid for 30 days, unless otherwise stated. <br />Heavy equipment, subcontractor fees and expenses, supplemental insurance, travel, shipping, reproduction, and other reimbursable <br />expenses will be invoiced at cost plus 20%, unless billed directly to, and paid by client. <br />A retainer of 50% of the fees may be required for projects with a total fee of $5,000 or less, with the balance to be paid at the time the <br />report is released to the client. <br />Thirty percent of the fee for field studies will be invoiced immediately to cover equipment and mobilization costs. <br />Client agrees to provide all information in Client's possession about the actual or possible presence of buried utilities and hazardous <br />materials on the site, and agrees to reimburse Leighton for all costs related to their unanticipated discovery. <br />Rates predicated on standard insurance coverage. <br />For "paid when paid" contracted work, Leighton Consulting, Inc. shall receive payment within 10 calendar days from when our client <br />receives payment for our services. <br />Minimum Hourly Charges for Field Technicians: <br />1. Monday -Friday 2 Hour Minimum <br />YY.......................................................................................................4 Hour Minimum <br />2. Saturday and Sunday............................................................................................. <br />* Effective January 1, 2004 through December 31, 2005, after which remaining work will be billed at then -current rates. <br />9060 499 <br />1-04P <br />(Continued on Reverse) <br />17781 Cowan ■ Irvine, CA 92614 <br />949,253.9836 0 Fax 949.250.1114 ■ www.leightonconsulting.com <br />