My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEIGHTON CONSULTING, INC. 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
K-L (INACTIVE)
>
LEIGHTON CONSULTING, INC. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:44:10 PM
Creation date
11/24/2004 1:54:07 PM
Metadata
Fields
Template:
Contracts
Company Name
Leighton Consulting, Inc.
Contract #
A-2004-103
Agency
Public Works
Council Approval Date
6/7/2004
Insurance Exp Date
2/14/2006
Destruction Year
2011
Notes
Amended By A-2004-103-01,-02
Document Relationships
LEIGHTON CONSULTING, INC. 2A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\K-L (INACTIVE)
LEIGHTON CONSULTING, INC. 2B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\K-L (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />d <br />Lcictc,n Co-s.IPn j Inc <br />~- u BASIS OF CHARGES FOR MATERIALS INSPECTION AND TESTING — Prevailing Wage <br />REGULAR WORK HOURS: <br />First 8 hours between 6:00 a.m. and 5:00 p.m. Monday through Friday, except holidays. <br />TIME AND ONE HALF: <br />After 8 hours and up to 11 hours Monday through Friday and Saturdays. <br />DOUBLE TIME: <br />After 11 hours and Sundays. <br />TRIPLE TIME: <br />Holidays: New Years, Memorial Day, Independence Day, Veterans Day, Thanksgiving and the day <br />after Thanksgiving, Christmas Day, and Labor Day, the first Saturday following the first Friday in the <br />months of June and December. <br />SHIFT DIFFERENTIAL: <br />Swing Shift: +10% for first 7% hours worked. Hrs. worked between 3:30pm-11 pm. <br />Graveyard Shift: +15% for first 7 hours worked. Hrs. worked between 11pm-ham. <br />MINIMUM HOURLY <br />A. Special Inspector (Field Time Only) <br />CHARGES — Inspectors & <br />1. Cancellation of Inspections not canceled by 4:00 p.m. on preceding day..................2 Hours <br />Technicians: <br />2. One-half working day or less......................................................................................4 Hours <br />3. Over one-half working day/or begins before noon and extends into afternoon ..........8 Hours <br />B. General Inspector (Field Time Only) <br />1. One-half working day or less......................................................................................4 Hours <br />2. Over one-half working day/or begins before noon and extends into afternoon ..........8 Hours <br />C. Technician — Field/Concrete <br />1. Cancellation of Inspections not canceled by 4:00 p.m. on preceding day..................2 Hours <br />2. One-half working day or less......................................................................................4 Hours <br />3. Over one-half working day/or begins before noon and extends into afternoon ..........8 Hours <br />CYLINDER HOLDS: <br />After the 28-day breaks meet PSI required strength, all HOLDS will automatically be disposed of, <br />unless specified in writing prior to the 2-8-clay break. <br />OUTSIDE SERVICES: <br />Outside services performed by others and direct costs expended on the client's behalf are charged at <br />cost plus 20%. These expenses include equipment rental, parking, subsistence, photographs, co- <br />insurance endorsement, etc. <br />MILEAGE CHARGES: <br />Mileage for inspection, testing or sampling, over a 40-mile radius from our nearest facility and less than <br />100 miles will be charged at $.50 per mile. (No mileage charge to and from our office). <br />REPORT CHARGES: <br />Secretarial time will be charged at $40 per hour. A maximum of 6 copies will be issued for each report. <br />FILE SEARCH & <br />Minimum $50 will be charged for Secretarial Time. <br />REISSUE OF REPORT: <br />REPORTING: <br />All reports contracted for by the client will be considered confidential information and submitted directly <br />to him. We will require the authorization of the client prior to distribution to parties other than those <br />designated in Section 1701 of the Uniform Building Code or Title 24, Part 1, California Administrative <br />Code. <br />PAYMENT TERMS: <br />Payment for services is due upon presentation. If not paid within 30 days of the invoice date, they will <br />be considered past due and a carrying charge of 1-1/2% per month (or the maximum rate allowed by <br />law) will be added to the unpaid balance, until paid in full. Any Attorney's fees or other costs incurred in <br />collecting any delinquent accounts will be added to the amounts due and shall be paid by the party <br />invoiced. <br />COMPLETION: <br />Inspector will remain on job until discharged by competent authority. <br />CANCELLATION: <br />No Charge if made before 4:00 p.m. of the preceding day. See Minimum Charge. <br />PARKING: <br />When not furnished for Inspector, parking will be charged as paid by the Inspector. <br />SUBSISTENCE: <br />On remote jobs, Subsistence, when not furnished for Inspector, will be charged by Quotation. <br />INSURANCE: <br />We carry all insurance required by law. The additional cost of any special insurance required by the <br />client, including increased policy limits, adding additional insured parties, and waivers of subrogation <br />will be billed at cost plus 20 percent. <br />LICENSES & PERMITS: <br />The additional cost of any special licenses or permits for a project will be billed at cost plus 20 percent. <br />PREVAILING WAGE: <br />The hourly rates provided are in compliance with prevailing wage requirements. As the rates for <br />California Prevailing Wage increase, our hourly rates will increase accordingly. <br />1-04P <br />of Santa Ana Environmental Remediation, Geotechnical and 17781 Cowan ■ Irvine, CA 92614 <br />
The URL can be used to link to this page
Your browser does not support the video tag.