Laserfiche WebLink
L.�iGNfT/'� <br />ATTACHMENT "A" <br />ANNUAL ENVIRONMENTAL REMEDIATION CONTRACT <br />CONSULTANT RATE COMPARISON FORM. <br />Consultant shall complete this form and include it along with the comprehensive fee schedule in the sealed <br />envelope. This comparison is based upon services required for the following sample project: <br />An Underground Storage tank is discovered on an existing site. A Phase II Assessment is -required to <br />analyze the site. In the assessment, it is determined that the 3 four -inch monitoring wells will be required to a <br />depth of approximately 60 feet below ground surface. The depth to the groundwater is expected to be <br />approximately 50 feet below ground surface. The primary objective of the investigation is to determine the <br />extent of the contamination in both soil and groundwater. Soil samples will be collected from each boring at <br />five-foot intervals for geological description. Selected samples (a total of three soil samples) will be <br />forwarded to a California certified laboratory for chemical analysis. The samples are to be analyzed by the <br />following EPA Methods: <br />EPA Method No. 8015 (modified) <br />EPA Method No. 60106/7000 CAM Metals, and <br />EPA Method No. 8260. <br />Based on the results of the Phase II Assessment and the monitoring wells, prepare a report for the Regional <br />Water Quality Control Board. The cost comparison should include all costs necessary to satisfy the <br />requirements stated in the RFP. Consultant may add more tasks and classification to better represent actual <br />staff and tasks. <br />Utility Potholing <br />One mile of storm drain is planned to be constructed in an arterial road. <br />Provide all costs necessary to <br />provide 15 utility potholes. Include traffic control. Assume the City will provide survey. <br />Description of Consultant Services <br />Unit Quantity <br />Unit Cost S <br />Total <br />Prepare Work Plan <br />LS <br />1 <br />$ <br />850 <br />$ <br />850 <br />Prepare Health & Safety Plan <br />LS <br />1 <br />$ <br />400 <br />$ <br />400 <br />Mobilization & Demobilization <br />LS <br />1 <br />$ <br />800 <br />$ <br />800 <br />Geophysical survey <br />LS <br />1 <br />S <br />2,200 <br />$ <br />2,200 <br />Installing Monitoring Wells <br />EA <br />3 <br />$ <br />3,275 <br />$ <br />9,825 <br />Laboratory Analysis <br />LS <br />1 <br />$ <br />960 <br />$ <br />960 <br />Waste Disposal (soil 55-gal drum) <br />EA <br />3 <br />$ <br />110 <br />$ <br />330 <br />Prepare Draft Report to RWQCB <br />LS <br />1 <br />$ <br />2,700 <br />$ <br />2,700 <br />Prepare Final Report to RWQCB <br />LS <br />1 <br />$ <br />800 <br />8 $ <br />800 <br />LS <br />$ <br />- <br />Total: <br />S <br />18.865 <br />Utility Potholing Ea 15 $ 553.00 $ 8,295 <br />Utility Potholing includes USA Alert, mark -out, traffic control, backfill, compaction and site restoration <br />Laboratory soil sampling is not included. <br />