My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COAST INTERFAITH 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
O (INACTIVE)
>
ORANGE COAST INTERFAITH 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:46:13 PM
Creation date
12/8/2004 12:57:50 PM
Metadata
Fields
Template:
Contracts
Company Name
Orange Coast Interfaith Shelter
Contract #
A-2004-087-30
Agency
Community Development
Council Approval Date
5/3/2004
Expiration Date
6/30/2005
Insurance Exp Date
1/17/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/04 <br />dwelling units includes, without limitation: notification, evaluation by visual assessment, paint <br />stabilization utilizing safe work practices, and clearance. <br />(2) CITY advises SUBRECIPIENT that in the event the <br />services provided hereunder include rental assistance payments, such as first and last month's <br />rent and/or security deposit, and the assisted tenant executes a lease for long term occupancy, <br />including occupancy in the same dwelling unit for more than 100 days, then the provisions of <br />Subpart M (Tenant Based Rental Assistance), will apply (unless otherwise informed and directed <br />by HUD). In this regard, CITY advises SUBRECIPIENT that Subpart M requires HQS <br />inspection of each dwelling unit prior to occupancy and prior to compliance with applicable <br />notification, evaluation by visual assessment, reduction through paint stabilization utilizing safe <br />work practices, and clearance requirements of the LBP REGS. <br />(e) Lead Hazard Reduction Work. SUBRECIPIENT shall cause LBP hazard <br />reduction, such as paint stabilization, interim controls, standard treatments, or abatement of all <br />residential property that is under its ownership, possession, or control and/or residential property <br />occupied by persons or families that receive financial or other assistance from SUBRECIPIENT, <br />except as exempted as described in subsection 4(d)(i)(1) above. <br />(1) If paint stabilization occurs, SUBRECIPIENT shall cause paint <br />stabilization of each deteriorated surface and clearance of residential units pursuant to Section <br />35.1330(a) and (b) shall occur before occupancy of a vacant dwelling unit, or where a unit is <br />occupied, immediately after receipt of the CDBG FUNDS hereunder. <br />(2) Safe Work Practices shall be used in all LBP hazard reduction work. <br />(3) Clearance shall be conducted to confirm that no LBP hazards remain <br />when LBP hazard reduction work is complete. Confirmation of clearance by written certification <br />of a qualified inspector is required on an annual basis in connection with submittal of the April <br />15 quarterly report. <br />(f) Ongoing Maintenance. SUBRECIPIENT shall incorporate ongoing LBP <br />maintenance activities into regular building operations in accordance with Section 35.1355(a) for <br />all residential property that is under its ownership, possession, or control and/or residential <br />property occupied by persons or families that receive financial or other assistance from <br />SUBRECIPIENT, except as exempted as described in subsection 4(d)(i)(1) above. <br />(1) Ongoing maintenance includes confirmation of clearance which shall <br />be conducted to confirm that no LBP hazards remain when LBP hazard reduction work is <br />complete. <br />(2) Ongoing maintenance also includes confirmation of clearance by <br />written certification of a qualified inspector on an annual basis in connection with submittal of <br />the April 15 quarterly report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.