My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC COAST CABLING 3 - 2004
Clerk
>
Contracts / Agreements
>
P
>
PACIFIC COAST CABLING 3 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 1:55:19 PM
Creation date
12/8/2004 4:48:26 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Coast Cabling
Contract #
A-2004-189
Agency
Finance & Management Services
Council Approval Date
9/20/2004
Expiration Date
9/21/2007
Insurance Exp Date
1/1/2008
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPENDIX A <br />(Concluded) <br /> <br />Proposal Response Form <br /> <br />Sam Die Job #2: <br /> <br />Scope of Work: Contractor shall provide and install one (1216)-multi-mode / single mode, <br />fiber optic cable running from the basement Equipment Room ERB.2 to the ath floor <br />Telecommunications Closet TCa.1. Fiber optic cable will terminate in ERB.2 onto an <br />appropriately configured Lucent LGX Fiber Optic Distribution System, using an LST1 U- <br />072/7 shelf with ST-type connectors. In TCa.1, fiber optic cable should terminate onto an <br />appropriately configured Lucent Sliding Combination Shelf, using a 600B2 One-Unit High <br />type shelf with ST-type connectors. Rack space required exists at both termination points. <br />One, empty 4-inch conduit exists between ERB.2 and TCB.1 (the Basement <br />Telecommunications Closet that is vertically stacked with the rest of the floors including <br />our destination closet, TCa.1). Contractor shall provide and install (4) one inch, non- <br />plenum, corrugated innerduct from ERB.2 to TCB.1 via existing 4-inch conduit noted <br />above which is 150 ft in length. At exit pOint of conduit, transition (1) of (4) installed <br />innerduct to (1) one inch, riser-rated, corrugated innerduct, which will traverse from the <br />basement, stacked Telecommunications Closet, TCB.1, up to TC8.1. Contractor shall <br />provide (1) 4-inch core hole between TCB.1 and TC1.1. Building Facilities Management <br />has determined that floor is clear of obstruction for 4-inch core. Core hole shall be <br />sleeved, and fire stopped per local, state, and industry standard codes. <br /> <br />1) Provide a breakdown of hours to be billed. <br /> <br />2) Provide a breakdown of cost of materials. <br /> <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br /> <br />4) Provide approximation of elapsed time to complete work, beginning from authorization <br />to final acceptance. <br /> <br />Page 22 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.