My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS 2 - 2004
Clerk
>
Contracts / Agreements
>
P
>
P & D CONSULTANTS 2 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:17:39 PM
Creation date
12/9/2004 10:03:41 AM
Metadata
Fields
Template:
Contracts
Company Name
P & D Environmental
Contract #
A-2004-135
Agency
Planning & Building
Council Approval Date
7/6/2004
Expiration Date
6/30/2005
Insurance Exp Date
4/1/2006
Destruction Year
2010
Notes
Amended by A-2004-135-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. '. <br /> <br />, ' <br /> <br />. . ff5J2i'1/2004 13: 58 <br />. <br /> <br />714-9.53-698;1 <br /> <br />P&D CONSULTANTS <br /> <br />PAGE 02/07 <br /> <br />II <br /> <br />P&D Consultants <br />Pla.nersIE~.""sI /J rchirms <br />:mn !..I~I nl~\rMtl~ r...~ul+'\I."rJ <br />~~lil~~ ~:O <br />r.1!o'''fh~n.1. C1Ii'iOr:,¡."!- .t1 Jn1.'.!.1In <br />T~: (blh' :m..\. t1w:~ <br />f.:¡: fr.'l(}I'WJ.I14:";~ <br />1/l'\\'w.!,dnm~nl~.1:'!'1~.r(\"n <br /> <br />May 20, 2004 <br /> <br />Mr. Dan Bott <br />Environmental Coordi11ator, City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />By FAX <br /> <br />Re: <br /> <br />Proposal for Traffic and Noise Technical Studies Update and 2025 Analysis for the <br />French Park Traffic Management Plan <br /> <br />Dear Mr. Bott: <br /> <br />Thank you for considering P&D Consultants for the preparation of an update and 2025 <br />analysis for the traffic and noise componeots of the French Park Neighborhood Traffic <br />Management Plan in Santa Ana, Based on our undersÚU1ding of the project background, the <br />French Park Neighborhood Traffic Plan was implemented by thc City of Santa. Ana in <br />November 2001. The Plan included the closure of. three streets and the installation of <br />diverte,rs to discourage cut-through traffic in the French Park Neighborhood. Technical <br />studies were prepared in April 2003 that evaluated pre-project conditions (before street <br />closures, 2001) and post-project conditions (after street closures, 2002). The April 2003 <br />techmca1studies also evaluated traffic conditions in 201 0 with and without the divcrters. <br /> <br />Based on infonnation provided by the City and data collected for this proposal, the 2003 <br />traffic and noise technical studies wilJ be updated to include 2004 post closure l:J:à,ffic <br />conditions. In addition, a 2025 traffic conditions will be assessed. <br /> <br />For your review and consideration, P&D Consultants has prepared the attached scope of <br />work and cost estimate for the analysis update and 2025 analysis. Mr. Lew Garber, P.E, <br />Senior Vice Presi~cnt, will serve as the Prin.cipal-in-Charge and Ms. Christine Huard- <br />Spencer will provide NEPNCEQA coordination. Mr, Chris Pruitt will serve as Project <br />Manager and Transportation Planners Huabing Wang and Scott Banh will prepare the traffic <br />analysis. Environmental Scientist Tin CheuJ1.g will prepare the noise technical analyses. <br /> <br />SCHEDULE <br /> <br />P&D can complete the traffic and noise analyses in three weeks after receipt of field traffic <br />counts and collection of existing data/related reports. Typically, collection of field data and <br />counts takes five working days. Therefore, we anticipate that this updated analysis can be <br />completed in approximately one month. <br /> <br />EXHIBIT A <br /> <br />C:\Documcn~ 2nd Setl.inp';Jruittc\1)esktoþ\Lcttcr Pr.,posaJs\SaAi¡Qðt.:fr€IœJFlatk\.~(tpc and Fee.doc: <br /> <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.