Laserfiche WebLink
<br />EXHIBIT A <br />SCOPE OF WORK <br /> <br />SCRRA will design and construct a second platform and a pedestrian bridge at the Santa Ana <br />Regional Transportation Center. The existing center platform will be demolished and an inter- <br />track fence will be constructed between the tracks. The project cost estimate is as follows: <br /> <br />Design <br />Environmental Clearance <br />Geotechnical Boring & Report <br />Design <br /> <br />$1,000 <br />$15,000 <br />$351,846 <br /> <br />Sub Total <br /> <br />$367,846 <br /> <br />Construction <br />Mobilization & Surveying <br />Demolition & Removal <br />Excavation and recompaction of Onsite Material (platform) <br />Removal of Unsuitable Materials <br />Import Structural Fill <br />Platform Drain <br />Platform <br /> <br />Platform Canopies <br />Platform Electrical/Lights & Poles <br />Remodel Existing Structure <br />PCC Wheelchair accessible Ramp <br />Bridge & Elevator Support Structure w/stairs <br />Elevators <br />Signage <br />Inter-Track Fence <br />Public Address Changeable Message System <br /> <br />$10,000 <br />$25,000 <br />$6,000 <br />$850 <br />$10,200 <br />$16,000 <br />$416,000 <br />$105,000 <br />$22,000 <br />$0 <br />$0 <br />$1,735,000 <br />$450,000 <br />$20,000 <br />$16,000 <br />$100,000 <br /> <br />Construction Subtotal <br /> <br />$2,932,050 <br /> <br />Contingency <br /> <br />$439.808 <br /> <br />Contractor ProfiUOverhead <br /> <br />$674,372 <br /> <br />Total Construction <br /> <br />$4,046,229 <br /> <br />Construction Management <br /> <br />$606,934 <br /> <br />SCRRA Agency Costs <br /> <br />$457.414 <br /> <br />Total Project Cost Estimate <br /> <br />$5,478,423 <br /> <br />Agreement between City of Santa Ana and the Southern <br />California Regional Rail Authority for Construction and <br />Maintenance of Station Platform and Pedestrian Bridge <br /> <br />7 <br />