My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH , INC. 1 - 2004
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH , INC. 1 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:58:35 PM
Creation date
12/10/2004 12:21:31 PM
Metadata
Fields
Template:
Contracts
Company Name
Tetra Tech Inc.
Contract #
A-2004-079
Agency
Public Works
Council Approval Date
5/3/2004
Expiration Date
12/31/2005
Insurance Exp Date
10/1/2005
Destruction Year
2010
Notes
Amended by A-2004-268
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'. <br /> <br />'. <br /> <br />~ <br /> <br />TETRA TECH, INC. <br />Infrastructure Services Group <br /> <br />April 14, 2004 <br /> <br />Mr. Steve Worrall, Sr. Civil Engineer <br />City of Santa Ana, Public Works Agency <br />Water Resources Division <br />220 South Daisy Avenue <br />Santa Ana, CA 92703 <br /> <br />Reference: <br /> <br />Proposal to Provide Professional Engineering Services for the <br />Elevated Water Tank Improvements <br /> <br />Dear Mr. Worrall: <br /> <br />Tetra Tech, Inc. is pleased to submit our proposal to provide professional engineering services to <br />prepare Plans, Specifications and Cost Estimates (PS&E) for the Elevated Water Tank <br />Improvements. Our previous work on the Elevated Water Tank (Project No. 3180) makes us <br />uniquely qualified to perform this assignment. <br /> <br />In late 2001, Tetra Tech completed the design of the Elevated Water Tank Improvements. The <br />improvements included tank safety related issues (ladder, safety climb devices, cages, balcony and <br />walkway safety railings), enlarging the roof manholes, modifying the roof vent and cathodic <br />protection hand hole covers, upgrading the existing valve vault and piping, and improving the <br />drainage inside of the foundation ring. Construction bids were received, however, the bids were all <br />above the approved budget amount. Therefore, the construction contract was not awarded. <br /> <br />Since then, the City has completed the piping and valve vault improvements with City forces. In <br />addition, the City has decided to paint/re-coat the tank at the same time the improvements are <br />completed. Therefore, the City has increased the approved budget for the proposed tank <br />improvements to include the work that was not previously completed as well as the cost to paint/re- <br />coat the tank. <br /> <br />Thank you for giving us the opportunity to submit our proposal. We look forward to once again <br />providing service to the City. <br /> <br />S~y, <br />1o~p~ <br /> <br />Proj ect Manager <br /> <br />TLE/te <br />t\temp\water\tle\santa ana proposal.doc <br /> <br />Attachment <br /> <br />16241 L:\g'JI::\ CJ.I1YOll Ro;-Id. Suite 200. I!'vine, CA 92618 <br />TeI949.727.7099 F;lX 949.727,7097 <br />www.te(r3tech.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.