Laserfiche WebLink
<br />TRC Solutions, Inc. <br />TIME & MATERIAL PRICING SCHEDULE <br /> <br />PROFESSIONAL FEES (per hour) <br /> <br />Principal <br />Senior Associate <br />Associate <br /> <br />$150.00 <br />$130.00 <br />$120.00 <br /> <br />Senior Project <br />Geologist, Engineer, Hydrogeologist, Scientist <br />Construction or Health & Safety Manager <br /> <br />$ 95.00 <br /> <br />Project Level <br />Geologist, Engineer, Hydrogeologist, Scientist <br /> <br />$ 85.00 <br /> <br />Senior Staff <br />Geologist, Engineer, Hydrogeologist, Scientist <br /> <br />$ 80.00 <br /> <br />Staff <br /> <br />Geologist, Engineer, Hydrogeologist, Scientist <br /> <br />$ 75.00 <br /> <br />The above rates do not apply for the preparation of testimony, court appearances and depositions. <br />Appearances at depositions or trials (whether or not TRC Alton Geoscience has been designated as an expert <br />witness) will be charged at $1,950 per day for a Principal, $1,570 per day for an Associate or Senior <br />Associate, and $1,360 per day for a Senior or Project level professional. All of the preceding charges will be <br />on a portal-to-portal basis, with a one-half day minimum. <br /> <br />TECHNICAL RATES (per hour) <br /> <br />Superintendent <br />Construction Foreman <br />Senior Technician <br />Computer Graphics/CAD Technician <br />Construction Technician <br />Environmental, Geological, or Engineering Technician <br />Technical Writer <br />General Clerical! Administration <br /> <br />$ 85.00 <br />$ 75.00 <br />$ 60.00 <br />$ 60.00 <br />$ 55.00 <br />$ 50.00 <br />$ 50.00 <br />$ 45.00 <br /> <br />For customer-approved overtime, multiply above rates by 1.5 (overtime includes work extending beyond 8 <br />hours Monday through Friday; work perfonned on Saturday and/or Sunday; and work that commences after <br />5:00 p.m. Monday through Friday). <br /> <br />City of Santa Ana <br /> <br />-1- <br /> <br />