My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25O - LOAN AGMTS ORANGE HOUSING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
12/20/2004
>
25O - LOAN AGMTS ORANGE HOUSING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:59:54 PM
Creation date
12/14/2004 4:46:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25O
Date
12/20/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />",'/on, /iOIl 1'/1/11 (or till' ()/ //)(' \1 ill II il' -"11'1'/'1 I'rojl'rI <br /> <br /> ~ <br /> ~ <br />f::=:= I <br /> I 4 'r <br /> I ... II: <br /> ::::::=;:::: <br /> r--. -'"' <br />. ..-.. 1.._.- _.__.. <br /> <br />Figure 2: Project Site Location <br /> <br />B. PROJECT DESCRIPTION <br /> <br />Previous phases of the Project, completed in May 2002 and November 2003 involved the <br />rehabilitation of 110 one-bedroom apartment units in 11 buildings and rehabilitation and <br />reconfiguration of existing layouts in five additional buildings consisting of 1 0 one-bedroom <br />units each. Interior rehabilitation activities included major kitchen and bathroom <br />improvements as well as replacement of floor coverings, doors and windows. Exterior <br />improvements included the addition, repair or replacement of roofs, staircases, balconies, <br />landscaping, water heaters, decking, trash enclosures, parking lots and building facades. <br /> <br />Current Project involves four buildings. The construction scope includes interior and <br />exterior improvements similar to those of previous phases as well as the intended <br />reconfiguration of existing layouts. The rehabilitation and construction cycle will last 3 to 4 <br />months per building and proceed one building at a time commencing at 1122 Minnie Street. <br />The Project construction is expected to begin immediately following the City approval in <br />December 2004. <br /> <br />Pn'/r"r"d fll! ()/ll'rlt1l1d, P/1ci(ir l~ ClltltT, /1It'. <br /> <br />['ogf' .1 <br /> <br />250-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.