My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31C - 2116 3/4 W. MONTE VISTA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
01/03/2005
>
31C - 2116 3/4 W. MONTE VISTA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:59:44 PM
Creation date
12/29/2004 10:32:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31C
Date
1/3/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DECEMBER 13,2004 <br />PAGE 2 OF 3 <br /> <br />by the Federal Communications Commission (FCC). Prior to the <br />issuance of any permits to install the facility, (Permit <br />Applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Communications Division of <br />the Orange County Sheriff-Coroner Department to minimize, to <br />the greatest extent possible, any interference with the Public <br />Safety 800 MHz Countywide Coordinated Communications System <br />(CCCS) . Similar consideration shall be given to any other <br />existing or proposed wireless communications facility that may <br />be located on the subject property. <br /> <br />5. <br /> <br />At all times, the permit applicant shall not prevent the City <br />of Santa Ana from having adequate spectrum capacity on the <br />City's 800 MHz radio frequency. <br /> <br />6. <br /> <br />Before activating its facility, the permit applicant will <br />submit to a post-installation test to confirm that "advanced <br />planning and frequency coordination" of the facility was <br />successful in not interfering with the City of Santa Ana <br />Public Safety radio equipment. This test will be conducted by <br />the Communications Division of the Orange County Sheriff- <br />Coroner Department or a Division-approved contractor at the <br />expense of the Applicant. This post-installation testing <br />process shall be repeated for every proposed frequency <br />addition and/or change to confirm the intent of the "frequency <br />planning" process has been met. <br /> <br />7 . <br /> <br />The permit applicant shall provide a 24-hour <br />which interference problems may be reported. <br />will also apply to all existing facilities <br />Santa Ana. <br /> <br />phone number to <br />This condition <br />in the Ci ty of <br /> <br />8 . <br /> <br />The permit applicant will provide a "single point of contact" <br />in its Engineering and Maintenance Departments to insure <br />continui ty on all interference issues. The name, telephone <br />number, fax number and e-mail address of that person shall be <br />provided to City's designated representative upon activation <br />of the facility. <br /> <br />9. <br /> <br />The permit applicant shall insure that lessee <br />shall comply with the terms and conditions of <br />shall be responsible for the failure of any <br />users under the control of permit applicant to <br /> <br />or other user (s) <br />this permit, and <br />lessee or other <br />comply. <br /> <br />31 C-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.