Laserfiche WebLink
<br />Relocation Plan for the OHDC 901 East 6th Street Project <br /> <br /> <br />Figure 2: Project Site Location <br /> <br />B. <br /> <br />PROJECT DESCRIPTION <br /> <br />The Developer has conducted a thorough inspection of the Project building and is <br />proposing to undertake all needed improvements to the individual units, up to six units at <br />a time. Interior rehabilitation activities will include replacement of major kitchen appliances, <br />new paint and bathroom enhancements as well as replacement of floor coverings, doors <br />and windows. Exterior improvements will include the addition, repair or replacement of <br />roofs, staircases, balconies, landscaping, water heaters, decking, trash enclosures, parking <br />lots and building facades. <br /> <br />Prepared by Overland, Pacific & Cutler, Inc. <br /> <br />Page 3 <br /> <br />JT25K-12 <br />