Laserfiche WebLink
<br />:..,... <br /> <br />'. <br /> <br />1/ <br /> <br />'. <br /> <br />Pacific Systems Electric <br />38330 Via La Paloma <br />Murrieta California 92563 <br />California State License No. 561275 <br />S~YV¡C'¡~'0 the pett-ote""" l,^-ct".tYfj S¡V\.C/ l,~i?~ <br /> <br />October 6, 2004 <br />CITY OF SANTA ANA <br />Police Department '. <br />Santa Ana <br />Attn:' Mario <br />PAGE 1WO. <br /> <br />" <br /> <br />/ ANNUAL VAPQR RECOVERVTESllNG <br />, . To comply with the South Coast Air Quality Management District and the California <br />State Air Resource Board, Pacific Systems Electric a licensed SCAQMD test compa(1) <br />will provide Rule 461 Vapor Recovery Testing that is required once a year for the <br />'unleaded pump systern at each location. PSE shall provide the required testing to <br />include TP201.3. Leak Decay and TP201,4 Back Pressure/Blockage and all other <br />testing required that is speci1ic to each site configuration. Testing will also include no... <br />installed Enhanced Vapor Recovery equipment tests. PSE will notify the SCAQMD of <br />test date, email and mail hard copy test results to the SCAQMD as required. Copies c' <br />test results will be supplied for each location's file. <br /> <br />DESIGNATED TANK OWNER / OPERATOR SERVICES <br />PSE will provide monthly inspection services and annual training as Designated <br />Operator for each location per SWRCB regulation. Each location will include the <br />following monthly inspection protocol. Plus, a plan speci1ic to each location will be <br />developed to include additional inspection items at the discretion of PSE to suppleml!r : <br />these items: <br /> <br />1. PSE will send a letter to the Local Agency that identifies this firm as the <br />designated tank operator for each City Dept UST location and that the USTs .3r ~ <br />in compliance with all applicable underground storage tank requirements. <br />2. PSE will provide a copy to each location to be kept with the tank log records of; I <br />Certificate indicating completion of the California UST System Operator exam <br />3. PSE will perform monthly visual inspections of all UST systems at each locatior <br />Results of inspection shall be recorded in a rnonthly inspection report form that <br />will include the following items that will be supplemented as indicated above: <br />A. Review alarm history report for the previous month, checking that each <br />alarm condition was documented and responded to appropriately. A cop I <br />of the alanm history report or log, along with documentation describing <br />action taken in response to any alarms(s), shall be attached to the mont~y <br />visual inspection record. <br />B. Inspect for the presence for hazardous substance, water, or debris in spi <br />containers. <br />C. Inspect for the presence of hazardous substance, water, or debris in und ~r <br />dispenser containment areas, and checking that the monitoring equipmeJlt <br />in these areas is located in the proper position to detect a leak at the <br />earliest possible opportunity. <br /> <br />909.677.0704 <br /> <br />Fé!X 909.698.5436 <br /> <br />888.29~.5944 <br /> <br />vO'E;v2'OSL <br /> <br />~OOUUH sJuuaa <br /> <br />d20 It 0 toe so <¡oo <br />