My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 2775 N. MAIN ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/07/2005
>
75B - 2775 N. MAIN ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:59:09 PM
Creation date
2/2/2005 1:29:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
2/7/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EIR No. 2004-01; ZOA No. 2004-06; <br />DA No. 2004-04; CUP No. 2004-28; <br />VTTM No. 2004-06; and SPR No. 2004-05 <br />October 25, 2004 <br />Page 4 <br /> <br />four-bedroom units. Two-car garages <br />space will be provided for each unit. <br />per unit is 2.4. <br /> <br />with direct access to the living <br />The average parking spaces allotted <br /> <br />Analysis of the Issues <br /> <br />Environmental Impact Re~ort <br /> <br />The California Environmental Quality Act (CEQA) requires the preparation <br />and approval of an environmental impact report (EIR) for this project. <br />The environmental issues analyzed in the EIR include aesthetics, air <br />quality, cultural resources, land use, hazardous materials, <br />hydrology/water quality, noise, traffic and circulation, public services <br />and utility services. <br /> <br />A draft EIR (DEIR) is intended to inform public decision makers, <br />responsible and trustee agencies, and the general public of the potential <br />effects of the proposed project (Exhibit 4). On July 5, 2004 a Notice of <br />Preparation (NOP) was circulated for the preparation of Draft <br />Environmental Impact Report No. 2004-01. <br /> <br />In accordance with CEQA, a draft EIR is being circulated for review and <br />comment by the public, local, regional and state agencies, and interested <br />parties on October 15, 2004 for a 45-day review period. One of the <br />purposes of the Planning Commission's actions is to obtain input from <br />interested members of the public on the DEIR submitted at this hearing. <br /> <br />The DEIR has determined that implementation of the project would result in <br />unavoidable adverse impacts to air quality and traffic. All other <br />potential impacts associated with the project were determined to be less <br />than significant or were provided with mitigation to reduce impacts to a <br />level considered less than significant. <br /> <br />The City, after the 45-day review period has ended on the draft EIR, will <br />evaluate the comments on environmental issues received from persons or <br />agencies. In accordance with CEQA, each of the publ ic agencies and <br />interested parties that comment on the draft EIR will be provided a <br />response to their comments. Within the DEIR is the Mitigation Monitoring <br />Program for the project. In addition, the Findings of Fact and Statement <br />of Overriding Considerations have been included (Exhibit 5) . <br /> <br />758-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.