Laserfiche WebLink
<br />FUNDING ANALYSIS <br />PROJECT NOS. 1800, 1801, AND 1802 <br />SEISMIC RETROFIT OF THREE BRIDGES OVER THE SANTA ANA RIVER <br /> <br />Construction Contract <br />Contract Administration <br />Inspection and Testing <br />Survey Staking <br />Contingencies <br /> <br />$1,845,316 <br />94,753 <br />150,000 <br />32,000 <br />184,531 <br /> <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br /> <br />$2.306.600 <br /> <br />Exhibit 2 <br /> <br />23A-4 <br />