Laserfiche WebLink
<br />JANUARY 24, 2005 <br />PAGE30F4 <br /> <br />17. Prior to issuance of a grading permit, the project applicant <br />shall submit a final surface water runoff evaluation for review <br />and methods of draining the site without exceeding the capacity <br />of any street or adjacent storm drain facility. <br /> <br />18. Prior to the issuance of building permits, the project applicant <br />shall be responsible for the construction of on-site storm drain <br />systems. <br /> <br />19. The proposed project is subject to Drainage Area I Assessment <br />Fee. <br /> <br />20. Grading plans and building plans for the proposed project shall <br />reflect that the lowest finish floor elevation of any structure <br />shall be one foot above the highest adjacent grade for the AO-l <br />zone and at least as high as the depth number specified for the <br />AE Zone on the flood insurance rate map. All elevations must be <br />referenced to the National Geodetic Vertical Datum. Reference <br />should be made to the Flood Plain Management Ordinance for <br />complete requirements, Santa Ana Municipal Code, Chapter 7. <br /> <br />21. Grading plans and building plans for the proposed project shall <br />note that construction activities on the project site shall not <br />take place between the hours of 8: 00 p. m. and 7: 00 a. m. on <br />weekdays, including Saturday, or any time on Sunday or a federal <br />holiday. <br /> <br />22. No construction equipment on the project site shall operate <br />including warming up until after 7:00 a.m. <br /> <br />23. All construction equipment shall be properly maintained and <br />tuned to minimize noise emissions. <br /> <br />24. All equipment shall be fitted with properly operating mufflers <br />and air intake silencers no less efficient than those originally <br />installed. <br /> <br />25. Stockpiling and vehicle staging areas shall be located away from <br />existing residential uses. <br /> <br />26. The name and telephone number of a contact person shall be <br />posted on-site. <br /> <br />27. Construction shall be subject to any and all provisions set <br />forth by the City of Santa Ana Planning Department. <br /> <br />75A-23 <br />