Laserfiche WebLink
<br />8. <br /> <br />9. <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />shall include the minimum levels of plant materials shown on the <br />landscape plan and installed at the time of occupancy. <br /> <br />All materials excavated or graded will be sufficiently watered to <br />prevent excessive amount of dust. Watering with complete <br />coverage shall occur at least twice daily, once in the late morning <br />and once after work is done for the day. <br /> <br />All clearing and earthwork activities shall cease during period of <br />high winds (winds greater than 25 mph averaged over one hour) or <br />during Stage 1 or Stage 2 smog episodes. <br /> <br />Streets surrounding the project site should be cleaned at the end of <br />each day of construction. <br /> <br />All materials transported off-site shall either be sufficiently watered <br />or securely covered to prevent excessive amounts of dust. <br /> <br />The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br /> <br />To the extent feasible, equipment engines shall be maintained in <br />good condition and in proper tune according to manufacturer's <br />specifications. <br /> <br />To the extent feasible, gasoline powered equipment shall be used <br />for on-site and off-site construction activities. <br /> <br />Prior to issuance of grading permit, the applicant shall submit for <br />review and approval a surface drainage/grading/erosion control <br />plan prepared by a registered Civil Engineer, showing the direction <br />and means of flow to the adjacent street. The plan is to include <br />existing and proposed elevations adjacent to all property lines. <br />Drainage routed to the street must be directed beneath the <br />sidewalk and through the curb. <br /> <br />The geotechnical recommendations identified in the preliminary Soil <br />and Foundation Report prepared by H&T Soils testing, February <br />2004, shall be incorporated into plans and specifications. <br /> <br />Prior to issuance of a grading permit, the project applicant shall <br />submit a final surface water runoff evaluation for review and <br />methods of draining the site without exceeding the capacity of any <br />street or adjacent storm drain facility. <br /> <br />Resolution No. 2005-015 <br />Page 6 of7 <br /> <br />EXHIBIT "A" <br />