My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />.-' <br />...--, <br /> <br />Déliverables: The CONSULTANT will produce the following deliverable: <br /> <br />. <br /> <br />A Tracbvork Report incorporating the approved design standards for each. track <br />configuration, preliminary design drawings and specifications for each track <br />configuration, and the quantity, cost estimate and procurement strategy for each track <br />component. <br /> <br />, <br /> <br />The following paragraphs describes in greater detail the work scope that resulted from the <br />CONSULTANT's input during negotiations of the PE consulting services contract. <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule ofYalues: <br /> <br />Task 6.01 Trackwork Criteria <br />. Design Criteria for PE 6. scope of work. <br /> <br />, , <br />" , <br /> <br />Task 6.02 Track Plan and Profile Drawings <br />. General mainline alignment and yard layout is to be fmalized by end of month 6. <br /> <br />Task 6,03 NoiseNibrations InvestigationlRecommendations <br />. See Schedule of Yalues Task 1.06 Design Criteria and Standard Technical Specifications for <br />scope. <br /> <br />Task 6.04 Track Charts <br />. As defined in PE 6. <br /> <br />Task 6.05 Track Alignment D2,ta <br />. As defined in PE 6. <br /> <br />Task 6.06 Track Details <br />The key assumptions are: <br />. Stnlctural configurations of elevated structures are finalized by the end ofthe 6th month. , <br />. Interface with the power distribution systems (where/when related to track forms) as <br />developed through Schedule ofYalues Task 10.04 are finalized by end of the 5th month. ' <br /> <br />Task 6.07 Special Trackwork <br />. Locations and sizes of turnouts are finalized from the Operations Plan (Schedule of Values <br />Task 1.10) by the end of the 12th month. <br /> <br />Task 6.08 Trackwork Specifications <br />. Standard Technical Specifications for PE 6. scope of work. <br /> <br />Task 6.09 Standard and Directives <br />The key assumptions are the same as for Schedule of Values Tasks 6,02 and 6.06 above. <br /> <br />27 <br /> <br />@.- <br /> <br />- ----.- <br /> <br />~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.