My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2002-068
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
A-2002-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:48:23 AM
Creation date
2/25/2005 11:23:04 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Transportation Authority
Contract #
A-2002-068
Agency
Public Works
Council Approval Date
5/20/2002
Expiration Date
12/31/2004
Notes
Amended by A-2002-068-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />. <br /> <br />A standard design for both, the communications buildings and the traction power <br />subst"tions. " <br /> <br />. <br /> <br />Display material suitable for public meetings. <br /> <br />The following paragraphs describes in greater detail the work scope that resulted <br />CONSULT ANT's input during negotiations of the PE consulting services contract. <br /> <br />from the <br /> <br />The following clarifications are included as part of the CONSULTANT's Schedule of Values: <br /> <br />Task 9.01 Stations Criteria <br />. Design Criteria for PE 9. scope of work. <br />. This will be carried out in months one (1) through three (3) after NTP. <br /> <br />, , <br /> <br />Task 9.02 LayoutfDrawings and Specifications <br />. Preliminary station plans, elevations, standards and specifications for each CenterLine station <br />building, at the 30% level. <br />. Prepare material for public presentations showing station designs in plan anti profile. Be <br />available for presentations. <br />. Additional Stations: Allowance for PE level design for two additional stations in Irvine - at <br />Senior Center and Irvine Spectrum. <br />. Station Options: Concept design for up to three (3) alternative designs within the following <br />station areas: <br /> <br />>- Santa Ana - Downtown <br />>- Costa Mesa - South Coast Metro <br />>- Irvine - Main and Mac Arthur (at-grade option) <br /> <br />If any of these options need to advance beyond concept design resulting in more than one (1) station <br />per station area being carried forward, this will be work in addition to the defmed scope. <br />. This task will be carried out from month one (1) through sixteen (16). <br /> <br />Deliverables: <br />. Station design drawings at 1 "=20' scale or larger as required to the 30% level of design , <br />for each proposed CenterLine station, <br />. Design standards and specifications for all system-wide elements of the station platfonn <br />including but not limited to: power and communications conduits and outlets for public <br />address, CCTV, and lighting poles and fixtures. <br />. Display material suitable for public meetings, including scale models and artist <br />renderings. <br /> <br />LayoutfDrawings and Specifications, Schedule of Values Task 9.02, is broken out as sub-tasks in the <br />following paragraphs as they were presented in CONSULTANT's technical proposal. <br /> <br />35 <br /> <br />~ <br /> <br /> <br /><::0-r <br />
The URL can be used to link to this page
Your browser does not support the video tag.