Laserfiche WebLink
<br />'þ <br /> <br />'. <br /> <br />Instructions for Preparation of Farm HUD-S2567 <br /> <br />Prepare this form to d.sc~¡be each work project, or job, of extraordinary maintenance, propertY betterments and additions, and <br />replacement or addition of nonexpenda!>le equipment scheduled for accomplishment in whole or in part during the Requested <br />Budget Year. <br /> <br />.~ <br /> <br />Identification: The identification boxes at the top of the form are self-explanat...y. <br /> <br />. <br /> <br />Extraordinary Maintenance and Bettetments and Þ.ddltlons . <br /> <br />Column (1) Work Project Numbers: For work projects to be started during the Requested Budget Year assign consecutive .- <br />bers to identify them with the classification of work and the LHA Fiscal Year, and enter the numbers in this column. For ' <br />example: For Extraordinary Maintenance jobs to be started during the LHA Fiscal Year 1966, the number would be EM-66-1, <br />EM-66-2, etc. and for Betterments and Additions jobs the numbers would be BA-66-1, BA-66-2, etc. <br /> <br />Far work projects started in previous budget years and which will continue in the Requested Budget Year, enter the work proj- <br />ect number. assigned when the job was started. . <br /> <br />Column (2) Description: Describe each work project concisely, but sufficiently to give a full understanding of its nature an . <br />sco~. For work projects started in previous years, point out any significant changes in nature and scope. <br /> <br />Column (3) Housing Project Nu",ber: Opposite each work project number and description enter the number of the Housi ng <br />Projects at which the work is located. <br /> <br />Column (4) Te...1 Estimated Cost: Enter a realistic estimate of the total cost of each work project based, to the extent practi- <br />cable, on cHherough study of detailed specification of the work. If any part of the work is to be performed by Project staff the <br />estimated cost sheull¡~clude thè. appropriate portion of their salaries. If there has been a chanpe in the total estimated.. <br />of work stòrted in previous years, the revised total estimate should be entered and note to this effect included in the desc. <br />tion column. <br /> <br />Column (5) Percent Complete Current Budget Vear End: For work projects started in previous years, enter a realistic esti. <br />of the 'percen...ge of work that will have been completed at the end of the Current Budget Year. This percentage may or may nOl <br />correspond to the percentage of total estimated cost that will have been expended at that time. <br /> <br />Columns (6) alii! (7) Requested Budget Year: <br /> <br />Column (6) Estimated Expelll!ltureln Vear: For each work project enter a realistic estimate of the portion of Total Esti- <br />mated Cost, that wUI be expended during the Requested Budget Year. These estimates should include the appropriate <br />portion of salaries of Project staff which is to perform any of the work. <br /> <br />Column (7) Percent Complete Vear End: For each work project enter a realistic estimate of the percentage of work that <br />will have been completed at the end of the Requested Budget Year. This percentage may or may not correspond to the. <br />percentage of total estimated cost that will have been expended at that time. <br /> <br />Equipment Requirements <br /> <br />Column (8) Description: Under a heading "Replacement of Equipment" list each type of nonexpendable equipment to be <br />replaced, and sèparately under a heading "Property Additions" list each new type of nonexpendable equipment to be acquia <br />Give a brief description of each type and identify the Housing Project to which it is tobeassianed. . <br />. . <br />Column (9) Number of Items: Enter the number of items of each type of equipment to be purchased for each Housing Proie8 <br />des ignOled in Col umn (8). . <br /> <br />Column (10) Item Cost: Enter estimated net cost of each item of equipment, e.g. purchase price, less discounts, trade-in <br />allowance., and/or proceeds from dispo.ition of equipment being replaced. <br /> <br />Column (11) Estimated Ex~ndltlire In Vear: For each type of equipment, enter the estimated cast obtained by multiplying <br />the number of items in Column 9 by the item cost in Calumn 10. Alsa, enter total cost of equipment listed under each af <br />headings "Replacement of Equipment" and "Property Additions." <br /> <br /> <br />Ta""s <br /> <br />a. The tatal in Column 6 for Extraordinary Maintenance should be entered on Line 41, Column 5, of Farm HUD-52S64. <br /> <br />b. The total in Column 11 for Replacem.nt of Equipment should be entered on Line 42, Column 5, of For"; H-UD.52S64. <br /> <br />c. The .sum of the totals in Columns 6 and 11 f... Property Betterments and Additions shauld be entered on Line 43, Column 5, <br />of Form HUD.52S64. <br /> <br />. <br />. <br /> <br />HUD-52567 <br /> <br />GPO 88...888' <br />