Laserfiche WebLink
CONSENT CALENDAR STAFF RECOMMENDATIONS APPROVED - Continued <br /> <br />BID AWARDS <br /> <br />Awarded the following on basis <br />of lowest responsible and <br />responsive bidder: <br /> <br />SPEC 78-007 - Signal controller at Bristol and <br />Memory Lane (replacement); awarded to Safetran <br />Traffic Systems, Santa Aha, in the total amount <br />of $2,862.00. <br /> <br />SPEC 78-018 - Legal consultant/trainer for Police <br />Para-professional grant program; awarded to Kenneth <br />J. Kukuda, Attorney at Law, Tustin, in the amount <br />of $7,750.00. <br /> <br />PROJECT 8145 Replacement of sound system at <br />Santa Ana Municipal Stadium; awarded to L. A. <br />King Company, Long Beach, in the total amount <br />of $20,195.00. <br /> <br />PROJECT 8501A - Relocate storm drain at North <br />Main Parking Structure; awarded to Fleming <br />Engineering, Inc., Cerritos, in the total amount <br />of $19,000.00. <br /> <br />Authorized the quantity of Instant Recall Message Repeaters <br />to be increased from two to six, and awarded the following <br />on basis of only responsible and responsive bidder: <br /> <br />SPEC 78-009 - Six instant recall message repeaters; <br />awarded to Dictaphone Corporation, Santa Ana, in <br />the total amount of $8,872.20. <br /> <br />Rejected the bid from Ward LaErance Truck Corporation and <br />the alternate bid from American LaFrance as non-responsive <br />to the specification, and awarded the following on the <br />basis of lowest responsible and responsive bidder: <br /> <br />SPEC 78-014 - Triple combination pumper with squirt <br />for Fire Department (replacement); awarded to Crown <br />Coach Corporation, Los Angeles, in the total amount <br />of $154,587.14. <br /> <br />Rejected all bids. on the following because they exceeded <br />Engineer's Estimate, which would cause the project cost to <br />to be far in excess of the budgeted amount of $12,000.00, <br />and cancelled the project: <br /> <br />PROJECT 2058 - Memory Lane bike trail. <br /> <br />Awarded the following annual requirements on basis of <br />lowest responsible and responsive bidder: <br /> <br />SPEC 789-111 - Asbestos cement pipe; awarded Sizes <br />Standard 4", 8", 10", 18" and MOA 4", 8" x 3', 10" <br />x 6", 12" x 3" and MEE 10" Allied Pipe & Supply, <br />Inc., Santa Aha, in the estimated annual dollar <br />volume of $75,000.00. Awarded Sizes Standard 6", 12" <br />14", 16", MOA 6", 8" x 6', 10" x 3', 12" x 6', MEE & <br />MF 4", 6", 8", 12" to T.F.I. Water Works, Inc., <br />Santa Ana, in the estimated annual dollar volume of <br />$75,000.00. <br /> <br />CITY COUNCIL MINUTES <br /> <br />230 JUNE 19, 1978 <br /> <br /> <br />