My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-11 CRA
Clerk
>
Resolutions
>
COMMUNITY REDEVELOPMENT AGENCY (1974-2012)
>
1973-1989
>
1989
>
1989-11 CRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:21:27 PM
Creation date
3/3/2005 9:25:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
CRA 1989-11
Date
11/6/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Temporary culverts, ditches, catch basins, dams and settling ponds <br />will be installed where needed during construction activities to <br />maintain drainage flows and to collect excess water and sediments <br />flowing out of construction sites. Sediments collected will be <br />disposed of at a Class II or Class III disposal site. <br /> <br />2. Flood <br /> <br />d. <br /> <br />. <br /> <br />Impact Summary. A portion of the project area is located within the Santa <br />Ana River channel and portions of the project area are located within the <br />designated 100-year flood zone. Increased development in these areas will <br />be at some risk. <br /> <br />. <br /> <br />MitiQation Measures. With regards to flood impacts, mitigation measures <br />have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant effects as identified in the EIR. <br />These measures include project improvements to the storm drain system <br />which are included as part of the proposed project to the extent <br />redevelopment funds are available. <br /> <br />The Federal Flood Insurance Agency (FIA) may require additional mitigation <br />measures to qualify for federal insurance programs including requirements <br />that all structures built within the flood hazard area must have the first <br />habitable floor elevated above the surface level of flooding and <br />demonstration that the cumulative impact of proposed development would not <br />raise the depth of flooding by more than one foot at any point in the <br />communi ty. <br /> <br />3. Noise <br /> <br />Impact Summarv. Project-generated traffic will result in minor increases <br />in ambient noise levels. Residential units previously screened from <br />street noise may be exposed to higher noise levels as a result of street <br />widening and demolition of existing structures. <br /> <br />Construct i on related noi se may reacb .s ignifi cant 1 eve 1 sin the short term. <br /> <br />MitiQation Measures. With regard to noise impacts, mitigation measures <br />have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant effects as identified in the EIR. <br />These measures include: <br /> <br />a. <br /> <br />Construction activities will take place only during the hours <br />specified in the City of Santa Ana Noise Control Ordinance. <br /> <br />To the extent feasible, construction activities will be screened <br />from adjacent noise-sensitive land uses. <br /> <br />b. <br /> <br />. <br /> <br />c. <br /> <br />All construction equipment shall be equipped with properly <br />operating and maintained muffler exhaust systems. <br /> <br />Stationary equipment shall be placed such that emitted noise is <br />directed away from sensitive noise receptors. <br /> <br />d. <br /> <br />. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.