Laserfiche WebLink
<br />, . <br /> <br />Santa Ana City Council/ Community Redevelopment Agency <br />May 15, 1984 <br />Page Four <br /> <br />. <br /> <br />Most important, Santa Ana has failed to submit the Proposed <br />Development to the Joint Planning Review Committee, as <br />. required by Section 4.0(B) (6) of the TSIP. <br /> <br />Under those circumstances, the TSIP may not be available to <br />implement and fund mitigation measures associates with the <br />Proposed Development. The removal of this linchpin to the <br />matrix of mitigation measures proposed by the EIR would render <br />the EIR fatally defective. The EIR should be restudied and <br />revised forthwith to determine the environmental consequences, <br />and to formulate mitïgation measures relatin~ to, the Pro?osed <br />Development without the TSIP. <br /> <br />IV. <br /> <br />IMPROPER CONSIDERATION OF MEASURES REQUIRING THE <br />CONCURRENCE OF OTHER AGENCIES <br /> <br />The Proposed Development and mitigation measures include <br />several critical items that require the concurrence of the <br />City òf Orange. The EIR is deficient in that it fails to <br />consider the feasibility of those items; i.e., the possibility <br />that Orange may decline or be unable to implement any or all <br />of these items. <br /> <br />. <br /> <br />Traffic mitigation measures of the Proposed Development requiring <br />the concurrence and participation of the City of Orange include <br />the following: . <br /> <br />. <br /> <br />1. <br /> <br />The restriping of Bedford Road to four lanes; <br /> <br />2. <br /> <br />Installation of a traffic signal at the intersection <br />of Bedford Road and La Veta; <br /> <br />3. <br />4. <br /> <br />Restriping of Main Street at La Veta Avenue; <br /> <br />Widening of Main Street within the jurisdiction <br />of the City of Orange; <br /> <br />5. <br /> <br />Reconstruction of the median and develooment of <br />left turn pocket on Town and Country Roåd at <br />Uain Street; <br /> <br />6. <br /> <br />Modification of the traffic signal and phasing at <br />the intersection of Main Street and Town and Country <br />Road; <br /> <br />7. <br /> <br />Modification of interchange and construction of <br />bridge at Lawson Way, La Veta Avenue and the <br />Garden Grove Freeway: and <br /> <br />8. <br /> <br />Construction of Flower Street ramp connection to <br />the Orange Freeway. <br /> <br />\1... <br />