My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1975-17 CRA
Clerk
>
Resolutions
>
COMMUNITY REDEVELOPMENT AGENCY (1974-2012)
>
1973-1989
>
1975
>
1975-17 CRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:23:43 PM
Creation date
3/8/2005 8:54:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
CRA 1975-17
Date
12/10/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />./ <br /> <br />to show the location, size, access, and egress <br /> <br />for each suggested facility. <br /> <br />Such recommendations <br /> <br />. <br />. <br /> <br />shall consider the possible future loss of curb <br /> <br />parking space which may be required to provide <br /> <br />increased traffic capacity within the Project Area. <br /> <br />For any recommended parking facility, CONTRACTOR <br />shall estimate the unit cost in current dollars, <br /> <br />including land acquisition and facility construction <br /> <br />'I <br /> <br />costs and recommend methods for potential funding for <br /> <br />the construction of such parking facility. <br />Recommendations for modifying the City of Santa Ana's <br /> <br />Zoning Ordinance to reflect current parking require- <br /> <br />ments shall also be made. <br /> <br />In addition to the above, the CONTRACTOR shall determine <br /> <br />the percentage of private employees in the <br /> <br />study <br /> <br />area <br /> <br />who use buses in and out of the Civic Center. <br /> <br />Recommen- <br /> <br />dations regarding exclusive bus lanes and a bus signal <br /> <br />pre-emption traffic program shall also be included in <br /> <br />the study. <br /> <br />Furthermore, the CONTRACTOR shall determine <br /> <br />the demand for parking in the Study ~ea <br /> <br />and how that demand will effect the Orange County Transit <br /> <br />District's transit terminal parking facilities. <br /> <br />. <br /> <br />1. <br /> <br />Preparation of Final Report: <br /> <br />THE CONTRACTOR shall prepare a final report document- <br /> <br />. <br /> <br />ing CONTRACTOR's work for the entire project. <br /> <br />The <br /> <br />final report will build upon the Memoranda and the <br />progress reports generated by the CONTRACTOR during <br /> <br />the study and shall document the following: <br /> <br />. <br />I <br /> <br />Work effort and time put into study. <br />Existing traffic and parking conditions. <br /> <br />Traffic and parking problem identifica- <br />tion and analysis. <br /> <br />Parking and other related inventories conducted. <br /> <br />9 <br /> <br />C. tA t¡;-It <br />
The URL can be used to link to this page
Your browser does not support the video tag.