Laserfiche WebLink
<br />~~ <br /> <br /> <br />I <br /> <br />. <br />. <br /> <br />The product of this project task will <br />be a compilation of existing traffic data and deficiencies. <br />Additional data sufficient to complete the study shall <br />be collected by the CONTRACTOR after the deficiencies <br /> <br />in the available data have been identified. <br /> <br />The data <br /> <br />assembled and collected in tasks A and B shall be <br />cbc~ntéd and summarized in tables and maps, and pre- <br /> <br />sented in Memorandum Reports to the AGENCY. <br /> <br />'I <br /> <br />C. <br /> <br />Conduct Parking Study: <br /> <br />CONTRACTOR shall conduct an inventory of the length <br /> <br />and type of curb parking space on a block by block <br />basis in, the, Study Area. CONTRACTOR shall also <br /> <br />conduct an, <br /> <br />inventory of all off-street parking facili- <br /> <br />ties and shall obtain and supply the following information: <br /> <br />Classify public and private parking <br />facilities in the Study Area. <br /> <br />Identify the owner or operator of all <br />parking facilities. <br /> <br />Identify the number of stal~available by site. <br /> <br />Identify the number of levels for each <br />parking structure. <br /> <br />Indicate the business hours for each <br />parking facility. <br /> <br />. <br /> <br />ldentify whether attendant or self-parking operation. <br />Identify parking rates for each facility. <br /> <br />Curb and off-street parking supply shall be summarized <br /> <br />. <br /> <br />in tabular form and on aerial photo maps. <br /> <br />Blue line <br /> <br />aerial photo maps and original mylar maps of the Project <br /> <br />Area have been supplied by the City of Santa Ana's <br /> <br />Director of Public Works. <br /> <br />CONTRACTOR shall conduct a curb and off-street parking <br /> <br />. <br />8 <br /> <br />occupancy study during the week and on a Saturday or <br /> <br />Sunday. <br /> <br />Occupancy shall be determined on an hourly <br /> <br />basis between 8:00 A.M. and 6:00 P.M. <br /> <br />CONTRACTOR shall conduct a parking turn-over study <br /> <br />for the Project Area south of Washington Avenue. <br />Turn-over studies shall be conducted during the hours <br /> <br />4. <br /> <br />C R~5...A <br /> <br />L <br />