My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1977-12 CRA
Clerk
>
Resolutions
>
COMMUNITY REDEVELOPMENT AGENCY (1974-2012)
>
1973-1989
>
1977
>
1977-12 CRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:23:28 PM
Creation date
3/8/2005 9:37:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
CRA 1977-12
Date
6/28/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t8 <br /> <br />. <br /> <br />. <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />TASK III <br /> <br />Contractor shall assist Agency in obtaining and evaluating con- <br />struction bids. Contractor shall attend pre-bid conferences with all <br />interested contractors at times established by Agency and shall assist <br />Agency in selecting qualified bidders. <br /> <br />TASK IV <br /> <br />Contractor shall assist in monitoring the selected contractor's <br />construction of the project improvements to'assure compliance with <br />Agency requirements as outlined in the construction bid documents. <br />Contractor shall make periodic visits, not less than twice monthly, <br />to the site to determine the progress and quality of work and its <br />accord with the construction documents. Contractor shall recommend <br />to Agency's Executive Director rejection of work which does not <br />conform to the construction documents. <br /> <br />~ <br /> <br />Contractor shall assist Agency's Executive Director to prepare <br />change orders for any required changes in scope of the construction <br />documents and shall prepare sketches and cost estimates related thereto. <br /> <br />TASK VI <br /> <br />Contractor shall prepare a statement of estimated project construc- <br />tion costs for project improvements based on current unit costs related <br />to area, volume and other cost parameters upon completion of the con- <br />struction bid documents. <br /> <br />TASK VII <br /> <br />Contractor shall coordinate the design of the elements necessary <br />to construct the project improvements with the approved subcontractors <br />providing civil engineering and electrical engineering services. <br /> <br />TASK VIII <br /> <br />Contractor shall secure the services of a civil engineer to pro- <br />vide the following services for an amount not to exceed SEVEN THOUSAND <br />not to exceed SEVEN THOUSAND NINE HUNDRED FIFTY DOLLARS ($7,950): <br /> <br />1) Collect and review available information relating to exis- <br />ting utilities and coordinate with the City of Santa Ana and utility <br />companies disposition of such utilities. <br /> <br />-2- <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.