Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />8 <br /> <br />I <br /> <br />. <br /> <br />! I <br /> <br />. <br /> <br />. <br /> <br />F. <br /> <br />LAND USE <br /> <br />A land use compatibility analysis shall be conducted, <br />based on the Agency's land use plans, to determine the impact <br /> <br />of the structure. <br /> <br />G. <br /> <br />VIABILITY ANALYSIS <br /> <br />Based on data from the City of Santa Ana's traffic <br />engineer and Agency, the need for this project shall be 'eva1u- <br /> <br />ated and the supporting data leading to the conclusions shall <br />be documented. <br /> <br />H. <br /> <br />AESTHETICS <br /> <br />The project's landscaping plan and proposed archi- <br /> <br />tecture shall be reviewed relative to the surrounding setting. <br /> <br />I. <br /> <br />SOCIO-ECONOMICS <br /> <br />Based on Agency's economics data and previous studies <br /> <br />a simple cost revenue analysis shall be performed. <br /> <br />Each of the <br /> <br />above issues along with other applicable environmental disci- <br /> <br />plines shall be addressed relative to the existing setting, <br /> <br />impact, mitigation measures which may reduce the impacts to <br /> <br />insignificant levels, and unavoidable adverse impacts. <br /> <br />TASK III: <br /> <br />CONSULTATION <br /> <br />Comply with the consultation requirements of section <br /> <br />l5085(b) and section 15144 of the State EIR Guidelines. <br /> <br />TASK IV: <br /> <br />TECHNICAL FOLLOW-UP SUPPORT <br /> <br />Assist Agency in preparation of a final Environmental <br /> <br />Impact Report by attending coordination meetings and up to <br /> <br /> <br />three public hearings, assisting Agency and the City of Santa <br /> <br />Ana in the preparation of replies to reasonable comments <br />received during hearings and/or public circulation, and <br /> <br />preparing written material to be included in the final EIR <br />as requested by Agency. <br /> <br />3. <br /> <br />3 <br />