My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-066 CRA
Clerk
>
Resolutions
>
COMMUNITY REDEVELOPMENT AGENCY (1974-2012)
>
1973-1989
>
1980
>
1980-066 CRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:23:04 PM
Creation date
3/8/2005 11:41:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
CRA 1980-66
Date
6/16/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.pproval - Schematic Drawings. <br /> <br />Agency shall approve or disapprove <br /> <br />such Schematic Drawings. <br /> <br />. <br /> <br />Submission - Preliminary <br /> <br />Construction Drawings. Participant <br /> <br />shall prepare and submit to Agency <br /> <br />Preliminary construct~on DrEwings <br />for rehabilitation. <br /> <br />Approval - Preliminary Construc- <br /> <br />tion Drawings. Agency shall approve <br /> <br />or disapprove the Preliminary <br /> <br />Instruction Drawings for Rehab- <br />itation. <br /> <br />Submission - Final Construction <br /> <br />Drawings and Specifications. <br /> <br />Participant shall prepare and <br /> <br />submit to the Agency Final <br /> <br />Construction Drawings and Spec if- <br /> <br />ications for rehabilitation. <br /> <br />Approval - Final Construction <br />4IÞawings and Specifications. <br /> <br />Agency shall approve or disapprove <br /> <br />the Final Construction Drawings <br />and Specifications for rehabilitation. <br /> <br />t <br /> <br />Within 30 days after receipt by <br /> <br />Agency. <br /> <br />Within 60 days after ~gency <br /> <br />approval of Schematic Drawings. <br /> <br />Within 30 days after receipt by <br /> <br />the Agency. <br /> <br />Within 90 days after Agency approval <br /> <br />of preliminary Construction Drawings <br /> <br />and Specifications. <br /> <br />Within 30 days after receipt by the <br /> <br />Agency. <br /> <br />2 of 3 "If <br /> <br />5B <br />
The URL can be used to link to this page
Your browser does not support the video tag.