Laserfiche WebLink
<br />over one hour) <br />or during Stage <br />1 or Stage 2 <br />smog episodes. <br /> <br />Streets <br />surrounding the <br />project site <br />should be <br />cleaned at the <br />end of each day <br />of construction. <br /> <br />All material <br />transported <br />offsite shall <br />either be <br />sufficiently <br />watered or <br />securely covered <br />to prevent <br />excessive <br />amounts of dust. <br /> <br />The amount of <br />area disturbed <br />by clearing and <br />earthwork <br />activities shall <br />be minimized at <br />all times. <br /> <br />Equipment <br />engines shall be <br />maintained in <br />good condition <br />and in proper <br />tune according <br />to <br />manufacturer's <br />specifications. <br /> <br />To the extent <br />feasible, <br />gasoline powered <br />equipment shall <br />be used for <br /> <br />31A-64 <br />44 of 48 <br />